My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002349
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10998
>
2600 - Land Use Program
>
UP-92-27
>
SU0002349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2020 1:26:22 PM
Creation date
5/20/2020 2:39:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002349
PE
2626
FACILITY_NAME
UP-92-27
STREET_NUMBER
10998
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
10998 S HARLAN RD
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 4 <br /> PC: 10-1-92 <br /> UP-92-27 <br /> Page 3 <br /> Landscaping/Signs: <br /> In addition to the existing landscaping in front of the existing office building, it is recommended <br /> that a 10-foot-wide landscaping strip be required along the roads in front of the entire project. <br /> No signs are proposed. <br /> FACILITIES/SERVICES: <br /> Storm Drainage: <br /> On-site storm drainage is existing. The applicant is proposing to enlarge the pond to <br /> accommodate the additional runoff. In addition, it is recommended that all drainage from <br /> asphalted and cemented parking and driveway areas be routed through an oil and sand <br /> separator prior to entering the on-site pond <br /> ENVIRONMENTAL CONSIDERATIONS: <br /> An Initial Study was prepared for this project on August 31, 1992, and no significant environmental <br /> impacts were identified. On the basis of that review, a Negative Declaration was prepared. In addition, <br /> a Certificate of Fee Exemption with a'De Minimis Impact Finding'has been prepared which indicates that <br /> this project could not have a significant impact on fish and wildlife resources. <br />
The URL can be used to link to this page
Your browser does not support the video tag.