Laserfiche WebLink
COMMENTS ON DEVELOPMENTS <br /> SA-92-17 <br /> 3 . The Traffic Impact Mitigation Fee will be required for this <br /> development. The fee is due and payable at the time of <br /> building permit application. (The fee currently is $801. 00 <br /> per 1, 000 gross square foot of building as "Manufacturing" in <br /> the Lockeford area. The fee will be $834 . 00 per 1, 000 gross <br /> square foot of building as "Manufacturing" or $216 . 76 per <br /> trip-end generated in the Lockeford area effective February 17, <br /> 1992 . If there is no building permit required, the fee will <br /> be exempt. The fee shall be automatically adjusted July 1 of <br /> each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. ) <br /> (Resolution R-90-304 , R-91-1025) <br /> c: Manuel Lopez <br /> Deputy Director/Development <br /> 2 <br />