My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SEVENTH
>
15615
>
3500 - Local Oversight Program
>
PR0545683
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 3:18:09 PM
Creation date
5/20/2020 3:06:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545683
PE
3528
FACILITY_ID
FA0005408
FACILITY_NAME
LANGSTON ARCO*
STREET_NUMBER
15615
Direction
E
STREET_NAME
SEVENTH
STREET_TYPE
ST
City
LATHROP
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
15615 E SEVENTH ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County DIRECTOR <br /> o No W!y cpDonna Heran,REHS l <br /> ,_ oG Environmental Health Department r' ASSISTANT DIRECTOR <br /> qw,,+ w., 600 East Main Street Laurie Cotulla,REHS <br /> NIy , :` Stockton, California 95202-3029 - PROGRAM COORDINATORS <br /> 4F , Carl Borgman,REHS <br /> q <br /> Website:www.s /ehd Mike Huggins,REHS, RDI <br /> �IFOR �g ov.or 9 Margaret Lagorio, REHS <br /> Phone: (209)468-3420 Robert McClellon, REHS <br /> Fax: (209)464-0138 Jeff Carruesco,REHS, RDI <br /> Kasey Foley, REHS. <br /> T(9( t\ <br /> JAMES M & B LANGSTON <br /> 15820 S HARLAN RD #33 September 27, 2007 <br /> LATHROP CA 95330 <br /> RE: former Langston's Arco Site Code:1503 <br /> 15615 S. Seventh St. RO#00316 <br /> Lathrop, CA. 95330 CUF#: 00367 <br /> WORK PLAN: "2 nd Dual Phase Extraction Feasibility Study Work Plan" <br /> DATED: September 4, 2007 <br /> PREPARED BY: Advanced Geo-Environmental, Inc. - Jessica Rugge. <br /> STATUS: Approved <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN rH&S i <br /> 25296.10, subd(c)(3)1: <br /> • Test existing well "EW-1" (MW-1) for dual phase extraction (DPE) as <br /> required by the EHD. <br /> • Collect and analyze ground water samples for TPHg by EPA Method <br /> 8015m and BTEX and the fuel additives by EPA Method 826013. <br /> • Conduct a 48-hour DPE pilot pump test (ground water and soil vapor <br /> extraction) to determine area of influence and concentration of <br /> contaminants for a remediation.system design as required by the <br /> EHD. <br /> • Submit a Report of Findings to the EHD. <br /> COMMENTS AND CONDITIONS: <br /> • none <br /> REASONS FOR DISAPPROVAL OF THE WORK PLAN rH&S 25296 10 1 <br /> subd(c)(3)l: I <br /> • none <br /> k <br /> BY: <br /> Michael Infurna, Sen' r REHS. (209) 468-3454 <br /> , 1 <br /> r , <br /> r <br /> [X] electronically transmitted to consultant on:September 27,2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.