My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1013
>
3500 - Local Oversight Program
>
PR0545685
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 9:26:43 AM
Creation date
5/21/2020 9:22:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545685
PE
3528
FACILITY_ID
FA0006081
FACILITY_NAME
PATTERN STEEL CO
STREET_NUMBER
1013
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
1013 SHAW RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESPONan PATTON MEL <br /> 1011 ARA# R1) <br /> stockl,bN CA 95205 <br /> DAT$ NAX9 ACCT. coDb ftotma COMMENTS <br /> i <br /> 09/i4/90 Hi Knoll 212 013 Phoned Steve Furnace with <br /> WHF to discuss request <br /> for Phase II soil <br /> resampling (WHF's request +� <br /> letter dated August 15; <br /> 1990) . Also phoned and <br /> spoke with Tim Pryor <br /> regarding "Pilot". entry. <br /> for oversight. <br /> 08/14/90 Hi Knoll 215 0.4 Reviewed WHF's Phase II <br /> Soil Sampling - Proposal <br /> o8/it/90 k: Knoll 212 0:4 Spoke with Tim Pryor <br /> (realtor Handling <br /> property sale) regarding <br /> all correspondence <br /> prepared by this office <br /> for entry into "Pilot" . <br /> OB/1�/90 D. Hinson 212 1. 0 Spoke with Boyd Patton <br /> regarding site assessment <br /> work plan for 1013 Shaw <br /> 3 Rd. Stockton and Tim <br /> Pryor regarding local I <br /> oversight and "Pilot" <br /> program. <br /> 08/20/90 H. Knoll 212 1: 0 Met with Mr: Pryor and <br /> I Nor: Patton at <br /> Environmental Health <br /> Division (PHS/EHD) office <br /> to review corrective <br /> action options and soil i <br /> overexcavation <br /> requirements. <br /> 08/2 ./90 H. Knoll 212 0: 4 Met Richard Thorpe <br /> (contractor used for <br /> overexcavation) at EHD . <br /> office to review soil <br /> r� sampling of area in <br /> question: <br /> 08/21/90 H. Knoll 215 1.0 Scheduled inspection for <br /> + 8-22-90 after completion <br /> of work plan review. <br /> 08/22/90 H. Knoll 210 2 : 0 Field inspection made for <br /> verification sampling <br /> during overexcavation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.