Laserfiche WebLink
O +T#L M3 NAN Ari PAdE 2 <br /> 08/21/06 H. Knoll 215 0.7 Completed and filed <br /> wtittdit report for <br /> inspection performed <br /> s-22-90. <br /> 08/21/90 H: Knoll 215 iso Reviewed soil results for <br /> sampling 5-22-90. Phoned <br /> Canonie Laboratory for <br /> clarification of method. <br /> 08/27/90 H. Knoll 212 0:4 Spoke with Mr. , Pryor <br /> regarding lead results <br /> And method 7421 <br /> requested. i <br /> 09/28/90 H. Knoll 212 1 0.5 Received phone call from <br /> Wayne Smith, P.E. , Earth <br /> Systems Environmental; <br /> requesting report format <br /> from L.U.F.T. <br /> 08/29/90 M. Lagorio 212 0.5 Mr: Patton requested EHD <br /> correspondence copies he <br /> had not received. <br /> 08/36/00 H: Knoll 212 0: 2 Spoke with Mr. Patton <br /> regarding Canonie <br /> Laboratory soil report, <br /> and result interpretation <br /> by Wayne Smith. <br /> 09/04/90 H. Knoll 215 1:o Reviewed Earth systems <br /> environmental report <br /> .t signed by Wayne Smith <br /> I recommending site <br /> certification. <br /> 09/05/90 H. Knoll 215 0. 5 Reviewed Earth Systems <br /> Environmental report with <br /> M. Lagorib. <br /> I` 00/63/90 M. Lagorio 215 1: 5 Reviewed Earth Systems <br /> Environmental report. <br /> Completed Leaching <br /> Potential Analysis in <br /> 09/05/90 H: Knoll 212 0. 5 spoke with Mr: Patton <br /> regarding site closure <br /> and correspondence <br /> preparation. <br /> 09/07/90 H. Knoll 215 o.4 Completed status change <br /> " update and <br /> closure/certification <br /> r <br /> correspondence. <br />