Laserfiche WebLink
r a <br /> Section 3 described above: <br /> 6. Prepare an updated Site Conceptual Model (SCM)for the site in accordance with <br /> RWQCB (2004)guidelines for tank site investigations. <br /> t <br /> 7. Prepare and submit a Problem Assessment Report(PAR)to PHSEHD that will document <br /> all historical site assessment activities and data and incorporate the new data from soil <br /> borings and/or groundwater monitoring wells. Based on the data obtained from the . <br /> investigation appropriate recommendations will be made regarding any additional <br /> investigative work The PAR will present all drilling activities, any monitoring well <br /> construction,soil, and water sample analytical results, data analysis, conclusions, and <br /> recommendations for any further assessment action required for,the UST site that maybe <br /> necessary or if feasible,provide data for preparation of a Site Closure Document for the <br /> site. <br /> I <br /> i <br /> I <br /> MainlD%Environmenta151STF1Workplan%Wotkpfan11142007.wpd 4 <br /> f <br /> I <br /> i1 <br /> I <br /> 4 <br />