COST TABLE I '
<br /> REMEDIATION EQUIPMENT AND SYSTEM INSTALLATION COSTS
<br /> Former Canteen Facility
<br /> 1500 Shaw Road
<br /> Stockton, California
<br /> ORIGINAL ESTIMATED EQUIPMENT COSTS
<br /> Capital Equipment Qty. Units Unit Cost ! Item Costs ';II
<br /> Air Sparging Compressor, 3-HP, 240V, 3�Power 1 ea. $ 3,250 $ 3,250
<br /> Control System 1 ea. 2,050 2,050
<br /> In-Line Flow Meters(Rotometers) 7 ea- 125 875
<br /> Skid-Mounting of Sparging Equipment _ _ _ 1 ILS 2,100 _ 2,100
<br /> Soil Vapor Extraction Blower, 10-HP,240V, 3�Power 1 ;ea. 6,200 6,260
<br /> Control System 1 yea. 2,050 2,050
<br /> In-Line Flow Meters(Venturi) 5 ea. 540 _ 2,740 r
<br /> Skid-Mounting of SVE Equipment 1 LS2,100 2,100
<br /> elemetry System(Standard Phone Line Type) - 1 L5 3,050 _-- 3,050
<br /> Shipping for the Skid Equipment 1 LS 2,700 ;, 2,700
<br /> Delivery and Set-Up of GAC Vessels 2 . LS 2,095 4,190
<br /> Miscellaneous Equipment-Piping&Hoses(estimated)_- 1 LS 1,500 1,500
<br /> Eq ui ment Mark-Up - Cost+10% 1 LS 3,277 3,277 I
<br /> 5ubtbtal' $35 042,
<br /> BEST-BID REMEDIATION EQUIPMENT COSTS
<br /> Capital Equipment Qty. Units Unit Cost Item Costs i! i
<br /> 7 Sparging Compressor, 3-HP,240V,3�Power 1 'ea. $ 4,271 � $ 4,271
<br /> Soil Vapor Extraction Blower, 10-HP,240V, 30 Power 1 ea. 4,675 4,67.5
<br /> Moisture Separator Manifold 1 ea. 1,138 1,138
<br /> In Flow Meters(Venturi) _ _ _ -_-_ 5 ea. - 476 2,380
<br /> Control Panel and Associated Equipment 1 L5 3,530 3,530
<br /> Telemetry System(Standard Phone Line Type) 1 LS 3,300 3,300
<br /> Skid-Mounting of AS-SVE Equipment _ _ _ 1 _ LS 3,305 T 3,305
<br /> Shipping for the Skid Equipment 1 LS 1,600 1,660
<br /> Delivery and Set-Up of Oxidizer Unit 1 LS 3,200 3,200
<br /> Miscellaneous Equipment-Piping&Hoses(estimated) _ 1_ LS 500 .
<br /> E ui ment Mark-U2 Cost+10% 1 LS 2,790 2,790
<br /> ESTIMATED COSTS SAVINGS OVER PREVIOUS ESTIMATE: $5
<br /> '353
<br /> i
<br /> ESTIMATED COSTS FOR INSTALLATION OF PERMANENT EQUIPMENT SKID
<br /> [[Electrical
<br /> stallation Costs Qty. Units Unit Cost Item Costs j
<br /> Panel I Pole&Wiring to Control Panels Build 30 Bank 1 ea. 6,250 6,250
<br /> tallation Mark-Up - Cost+10% 1 ILS 625 625
<br /> SubtOta'1;; $6 875.,
<br /> Equipment and Itrstallatian Costs-Page I Delta Envtronmental Consultants,Inc..