Laserfiche WebLink
COST TABLE <br /> REMEDIATION EQUIPMENT AND SYSTEM INSTALLATION COSTS <br /> Former Canteen Facility <br /> 1500 Shaw Road <br /> Stockton, California <br /> Laboratory Costs Qty. Units Unit Cost .; Item Costs';j: <br /> 13TEX—Vapor Samples smpis $ 30 $ 120 <br /> PH/VOC--Vapor Samples { 4 smpis 40 160 <br /> Morita Vapor Analysis Unit(rental) ! 1 I LL S _ 250 '` 250 <br /> Laboratory Mark-Up — Cost+10% 1 ILS 53 i? ;53 <br /> Delta Environmental—Coordination &Supervision Qty. Units Unit Cost Item Costs :I! <br /> Sr. Engineer/Geologist-Office Coordination,&On-Site Supervision 24 hrs $ 85 $ 2,040 <br /> On-Site Construction Supervisor 24 hrs 65 r 1,5'60 <br /> (Estirrtatiad Tune On Site.2 to 3.;days? ,'; Subtotal $,3,'fiOD: <br /> Travel Costs Qty. Units Unit Cost 7 Item Costs 'II <br /> Per Diem(Lodging &Food) 3 days $ 100 $ 300 <br /> Airfare(Two Way) 1 LS 550 550 <br /> Vehicle Rental 1 week 225 225 <br /> Senior Engineer(16 hrs/trip) 16 hrs 85 1,360 <br /> Miscellaneous(Shipping, Special Items, etc.) _ ILS 100 100 ] <br /> Travel Costs Mark-Up—Cost+ 10% 1 1 _ LS 1 254 254 <br /> Subtotal , <br /> Delta Installation Report$Engineering Drawings Qty. Units Unit Cost Item Costs Ij <br /> Sr_ Engineer/Geologist i8 hrs $ 80 $ 640 <br /> Drafting 2 hrs 45 90 <br /> Miscellaneous Color Copies, Photos, etc 1 ea. 50 50 <br /> Subtotal $.78Q; <br /> 'ESTIMi4TED_TQTAL ,.'`: $.7f4;61]0: <br /> E <br /> I <br /> Equipment and Installation Costs-Page 2 Delta Environmental Consultants,Inc. <br /> r: <br /> tii <br />