My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1500
>
3500 - Local Oversight Program
>
PR0545688
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 11:47:17 AM
Creation date
5/21/2020 9:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545688
PE
3528
FACILITY_ID
FA0003634
FACILITY_NAME
CANTEEN CORPORATION
STREET_NUMBER
1500
Direction
N
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14326008
CURRENT_STATUS
02
SITE_LOCATION
1500 N SHAW RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
596
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST TABLE <br /> REMEDIATION EQUIPMENT AND SYSTEM INSTALLATION COSTS <br /> Former Canteen Facility <br /> 1500 Shaw Road <br /> Stockton, California <br /> Laboratory Costs Qty. Units Unit Cost .; Item Costs';j: <br /> 13TEX—Vapor Samples smpis $ 30 $ 120 <br /> PH/VOC--Vapor Samples { 4 smpis 40 160 <br /> Morita Vapor Analysis Unit(rental) ! 1 I LL S _ 250 '` 250 <br /> Laboratory Mark-Up — Cost+10% 1 ILS 53 i? ;53 <br /> Delta Environmental—Coordination &Supervision Qty. Units Unit Cost Item Costs :I! <br /> Sr. Engineer/Geologist-Office Coordination,&On-Site Supervision 24 hrs $ 85 $ 2,040 <br /> On-Site Construction Supervisor 24 hrs 65 r 1,5'60 <br /> (Estirrtatiad Tune On Site.2 to 3.;days? ,'; Subtotal $,3,'fiOD: <br /> Travel Costs Qty. Units Unit Cost 7 Item Costs 'II <br /> Per Diem(Lodging &Food) 3 days $ 100 $ 300 <br /> Airfare(Two Way) 1 LS 550 550 <br /> Vehicle Rental 1 week 225 225 <br /> Senior Engineer(16 hrs/trip) 16 hrs 85 1,360 <br /> Miscellaneous(Shipping, Special Items, etc.) _ ILS 100 100 ] <br /> Travel Costs Mark-Up—Cost+ 10% 1 1 _ LS 1 254 254 <br /> Subtotal , <br /> Delta Installation Report$Engineering Drawings Qty. Units Unit Cost Item Costs Ij <br /> Sr_ Engineer/Geologist i8 hrs $ 80 $ 640 <br /> Drafting 2 hrs 45 90 <br /> Miscellaneous Color Copies, Photos, etc 1 ea. 50 50 <br /> Subtotal $.78Q; <br /> 'ESTIMi4TED_TQTAL ,.'`: $.7f4;61]0: <br /> E <br /> I <br /> Equipment and Installation Costs-Page 2 Delta Environmental Consultants,Inc. <br /> r: <br /> tii <br />
The URL can be used to link to this page
Your browser does not support the video tag.