My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1500
>
3500 - Local Oversight Program
>
PR0545688
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 11:47:17 AM
Creation date
5/21/2020 9:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545688
PE
3528
FACILITY_ID
FA0003634
FACILITY_NAME
CANTEEN CORPORATION
STREET_NUMBER
1500
Direction
N
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14326008
CURRENT_STATUS
02
SITE_LOCATION
1500 N SHAW RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
596
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
it <br /> COST TABLE IIA <br /> SYSTEM O&M COSTS WITH CARBON VESSELS (One Quarter) <br /> Former Canteen Facility <br /> 1504 Shaw Road <br /> Stockton, California <br /> Unit Unit Estimated Unit Estimated <br /> Personnel /Service Qty. Freq, Units Rate Costsil <br /> Regular System Operation&Monitoring-Quarterly <br /> Senior Engineer-Site Visit(5 hrs/quarter) 5 1 5 hrs $ 80 /hr $ 400 <br /> Airfare/Lodging/Per Diem 1 1 1 LS 650 /unit 650 <br /> Rental Car 2 1 . 2 days 75 /day 150 <br /> Travel Time _ 16 1. 16 hrs 80 /hr 1,280 <br /> Senior Engineer-�Project Mgmt(5 hrs/month) 5 3 15 hrs 80 Ihr 1,200 <br /> Project Geologist-Project Mgmt(12_hrs/month) 12 3 36 hrs _ 75 Ihr _ 2,700 <br /> Technician (1)-Weekly O&M (Subcontractor) 1 13 13 LS 350 /unit 4,550 <br /> Ji <br /> Technician(1)-Carbon-Changeouts(Sub) 5 5. 25 hrs 75 /unit 1;875 <br /> Travel(100 miles/event) 1_00 18 1,800 miles 0.50 /unit _ 900 <br /> System O&M Mark-Up 1 1 1 LS Cost+ 10% 733 <br /> t Sul ifo1 1 . '`$;74,43$:. <br /> Operation and Maintenance Equipment&Supplies <br /> GAC Vessels-Rental 1 3 3 months 280 /month 840 <br /> GAC Vessels-Change-Outs 1 5 5 events 2,260 /event 11,300 <br /> GAC Vessels-Lab Fee(One-Time) 1 1 1 events _ 450 !event 454 <br /> Electrical Charges _ - 1 3W 3 months 700 /month 2,100 <br /> Filter Elements 2 1 3 6 each 15 /filter 90 <br /> Fluid(Condensation)Disposal 65 1 65 gal 0.50 /gal 33 <br /> Equipment&Supplies Mark-Up 1 1 1 LS Cost+ 10% 1,48"1 <br /> Subtotal $ 2t4 <br /> nalytical Costs _ ' <br /> VOCs--Mod. EPA 8260 for Vapor(First Month) 4 15 4 units $ 40 each $ 160 <br /> TPH-Mod. EPA SW846-8015G for Vapor(1st Mo.) 4 1 4 units 30 each 120 <br /> VOCs-Mod. EPA 8260 for Vapor(Subseq. Months 6 2 12 units 40 each 480 <br /> TPH-Mod. 8015G for Vapor(Subseq. Months) 6 2 s 12 units 30 each 360 <br /> Disposal Profile-Carbon from Vessels _ 1 1 1 unit 250 each 250 <br /> Subcontractor Mark-Up 1 1 1 LS Cost+ 10% 137 <br /> S <br /> ubfota! . 1370, <br /> Estimated ODM Services Quarterly : <br /> Carbon 0 Costs-Page I Delta Environmental Consultants,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.