Laserfiche WebLink
-'MAR-07 03 12:47 FRGM:AES RS 15129907399 TQ:209/- ,3433 PAGE;03 <br /> i <br /> i <br /> Michael McCreight - 2 - February 24, 2003 � <br /> A signed copy of the appropriate lead regulatory oversight agency approval letter for <br /> the proposed plan stud fill addenda. <br /> ❑ A complete copy of the Request for Bids (RFD) and a list of all firms invited to bid. It is <br /> strongly.recomrnended that the R.FB include a "fill-iu-the-blanks" Bid Form identifying all <br /> major Wks of the proposed work along with the following minimum cost breakdown,items <br /> for each task: <br /> • List of all staff.'/worker classifications and hourly rates of each to be utilized. <br /> ♦ The number of'hours to be utilized by each staff/worker <br /> S'ubcoutraCtOr COStS <br /> ♦ Equipment costs I <br /> ♦ Itemized listing of estimated ancillary/incidental costs <br /> ❑ Complete copies of all bids and other correspondence received in response to the RFH. <br /> All cost proposals should include the completed cost proposal breakdown, with task subtotals <br /> and a grand total cost for the entire scope of work. <br /> If youneed assistance in procuring contractor and consultant services or if you have any <br /> questions, don't.hesitate to call me. I can be reached.at(916) <(TECHPHONE». <br /> f <br /> Sincere <br /> Jennifer White <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> t <br /> Enclosure I <br /> k <br /> cc: Eric Muehlberger <br /> AES Regulatory Services, Inc. <br /> 2013 Wells Branch 'Parkway, Suite 206 <br /> Austin, Texas 78728 <br /> I <br /> i <br /> 1 <br /> California En vironmenta!Pratectron Agency <br />