Laserfiche WebLink
. 6. Control Panel&Associated Equipment <br /> a Type NEMA 4 <br /> b She Solid-State <br /> c Power 230-240V 3� Power will be provided to Control Panel <br /> Transformer required for 115-120 V equipment <br /> d Features <br /> i HLA Switches and Lights for Compressor and Solenoid Valve <br /> ii Adjustable Timer for Operation of the Solenoid in each of Three (or Two) Positions <br /> in Close Solenoid (Off) Valve upon alarm situations <br /> • High Temperature of Air Stream (> 150° F) <br /> • Shut Down of SVE System <br /> iv Counters for Hours Running Compressor and Solenoid Valve <br /> v Motor Starter for Compressor <br /> vi HLA Switches and Lights for SVE Blower <br /> vii Counters for Hours SVE Blower Running <br /> viii Shut Down of SVE System <br /> • High Temperature of Emissions Stream (> 225' F) <br /> • High-Level in Moisture Separator <br /> • High or Low Temperature from Oxidizer/Treatment Unit <br /> . ix 120V Non-Latched Outdoor Outlets (2) <br /> x Include strip connection(s) for communications with SVE System (Special Note: The <br /> communications will go one way only An alarm in the SVE system will stop both <br /> systems,but an alarm in the AS system will stop the AS air flow only,NOT the SVE) <br /> 7. Skid Mounting Equipment <br /> a Materials Steel <br /> b Size/Cap Estimated 8-ft x 12-ft— Please Specify in Your Bid <br /> c Features <br /> I Pre-plumbed with Galvanized Piping (AS) and 2-inch ID Schedule 80 PVC (SVE), <br /> unless otherwise noted <br /> ii Pre-wired for Compressor Operation <br /> iii Must mclude supported and flanged outlets for two delivery piping manifolds (1-inch <br /> galvanized) These skid outlets should be at approximately 6 to 7 feet above ground <br /> level <br /> iv Pre-Wired for SVE Blower and High-Level Shutoff Switch <br /> v Must include supported and flanged inlet for fluid manifold piping (2-inch PVC) <br /> The skid inlet should be at approximately 6 to 7 feet above ground level <br /> FOrmer Canteen Facility Remediation Equipment Specifications <br /> 1500 Shaw Road—Stockton, California June 5 2003 <br /> 3 <br />