Laserfiche WebLink
TELEMETRY OPTION <br /> Include approximate costs for a Telemetry Option We would mainly like to check and confirm <br /> (rather than control)operations of the equipment This is an option, so show me as many bells and <br /> whistles as you want. It will not affect the bid price. <br /> ELECTRICAL <br /> All panels, switches, and wiring must be compatible for a Class I, Zone 2, Group IIA (a k a Class I, <br /> Division 2, Group D) location An explosion-proof (XP) motor shall be required for the SVE <br /> blower TEFC motors will be acceptable for all other powered equipment, unless otherwise noted <br /> or approved Please consult the National Electrical Code (NEC 2002) for all applicable materials <br /> and configurations <br /> DELIVERY <br /> Please provide delivery costs for drop at a site in Stockton, California Special Note: You MUST <br /> provide a guaranteed delivery date Any delays in the delivery schedule not approved by AES may <br /> be penalized Please provide total shipping rates for the skid and attachments <br /> A Cost Breakdown Table is attached The VENDOR may supply their own table, which must <br /> include at least as much detail <br /> • <br /> Formei Canteen Facility Remediation Equipment Specifications <br /> 1500 Shaw Road—Stockton, California June 5, 2003 <br /> 4 <br />