Following the initial months of operation with the ICE unit, granular-activated carbon (GAC) vessels <br /> will be delivered to the site and utilized for the treatment of vapor emissions from the SVE <br /> equipment Two 1,000-1b GAC vessels will be mounted in series The second unit will provide <br /> back-up in case of breakthrough on the initial vessel Upon breakthrough, the second vessel shall <br /> become the first vessel and a new GAC vessel will be delivered to the site to act as the second vessel <br /> Carbon change-outs will be accomplished at the site on an as-needed basis <br /> The location of the equipment is indicated on Figures 9 and 10 General details of the mayor pieces <br /> of system equipment are presented on Figure 13, the remediation system process flow diagram <br /> (PFD) Specific details of the mayor system equipment and associated components are presented on <br /> Figure 14, the remediation system piping and instrumentation diagram (P&ID) A legend for the <br /> P&ID symbols and codes is presented on Figure 15 Information on the planned remediation <br /> equipment is presented in Appendix I <br /> D. SYSTEM CONTROLS AND INTERLOCKS/ALARMS <br /> An integrated control panel (NEMA 4 enclosure or such designation suitable for Class I, Division <br /> I1, Group D locations) will be installed to maintain the proper operation of the system and maintain <br /> communications between the various pieces of equipment If the System Interlocks and Alarms <br /> • (SIAs) located 1n the equipment compound are triggered, some or all of the system operations will <br /> be halted and a manual restart will be required for operations to continue There are six (6) SIAs <br /> located in the system that will affect operations and various components The following SIAs are <br /> included in the system <br /> SIA No. I --Air Sparging Solenoid Valve(SV--101) <br /> The primary SAI, which is linked to all the other SAIs, is the solenoid valve located in the air <br /> supply line for the sparging system If any of the other SAIs of the system are tripped, the <br /> solenoid valve will open to atmosphere, bleeding off supply air for the AS system During <br /> normal operations, specifically-timed cycles will be utilized to alternate flow between the <br /> North and South Sections of the AS System <br /> SIA No. 2—AS Compressor High-Temperature Switch (TSH-101) <br /> The air stream from the compressor will need to be below 150° F to avoid damage to the <br /> equipment of the AS Control Manifold To this end, the aftercooler (AC-101) will provide <br /> cooling of the C-101 airstream However, if the exhaust temperature from AC-101 exceeds <br /> the set point, this interlock(designated as SAI No 2 on the PFD)will ensure that the solenoid <br /> • valve (SV-101) is closed and C-101 is shutdown If this interlock is triggered, air flow will <br /> cease and the system will require a manually reset Upon reset the cause for the temperature <br /> excess will be investigated <br /> V-4 <br />