My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010336 (2)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1500
>
3500 - Local Oversight Program
>
PR0545688
>
ARCHIVED REPORTS_XR0010336 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 11:23:19 AM
Creation date
5/21/2020 10:29:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010336
RECORD_ID
PR0545688
PE
3528
FACILITY_ID
FA0003634
FACILITY_NAME
CANTEEN CORPORATION
STREET_NUMBER
1500
Direction
N
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14326008
CURRENT_STATUS
02
SITE_LOCATION
1500 N SHAW RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST TABLE <br /> RECOVERY WELL INSTALLATION <br /> Former Canteen Facility <br /> 1500 Shaw Road <br /> Stockton, California <br /> No of Cost per Estimated <br /> Personnel !Service Units Unit Cost <br /> Personnel Costs &Travel <br /> Senior Engineer—Coordination 15 hrs $ 80 /hr $1,200 <br /> Project Hydrogeologist—On-Site Supervision 70 hrs 75 /hr 5,250 <br /> Travel Time 16 hrs 75 /hr 1,200 <br /> Airfare (Two-Way) 1 LS 550 /unit 550 <br /> Per Diem (Lodging & Food) 7 days 100 /day 700 <br /> Equipment Truck(Rental) 1 week 250 /week 250 <br /> Miscellaneous (Fuel, Sampling Supplies, etc ) 1 LS 200 /unit 200 <br /> Travel Mark-Up --- LS Cost + 10% 290 <br /> Subtotal $9,640 <br /> Sparging &Extraction Well Installation— 12 AS Wells &3 SVE Wells 1 <br /> Drilling Contractor—AS Wells @ 60 feet (2-inch Dia ) 12 wells $1,550 /well $18,600 <br /> Drilling Contractor—SVE Wells @ 40 feet(2-inch Dia ) 3 wells 1,080 /well 3,240 <br /> Drilling Contractor— Mob/Demob 6 units 300 /unit 1,800 <br /> Well Development—Surge Block(all 13 AS wells) 13 units 85 /unit 1,105 <br /> Disposable Bailers 4 units 8 /unit 32 <br /> Rinse Water Drums 6 drums 40 /drum 240 <br /> Subcontractor Mark-Up --- LS Cost+ 10% 2,502 <br /> Subtotal $27,519 <br /> Waste Management <br /> Soil Pick-Up & Transportation 18 cu yds $1400 /yd --- <br /> Soil Disposal Costs 18 cu yds 1050 /yd --- <br /> Subcontractor Mark-Up --- LS Cost + 10% - <br /> Subtotal See Note 2 <br /> Analytical Costs <br /> Soil Samples— BTEX/TPH Analyses 1 units $ 90 /unit $ 90 <br /> Soil Samples —VOC Additives Analysis 1 wells 175 /unit 175 <br /> Water Samples— BTEX/TPH Analyses 4 wells 90 /unit 360 <br /> Subcontractor Mark-Up --- LS Cost+ 10% 63 <br /> Subtotal $ 688 <br /> TASK TOTAL $37,846 <br /> G IDocslCompass1940091Tab1es\RAP Costs(07-07-03)xis <br /> NOTES- <br /> 1 One air spargmg (AS) well and two soil vapor extraction (SVE) wells were installed during the pilot testing <br /> activities, previously conducted at the site A20 <br /> 2 The soil disposal costs for the auger cuttings are included in the installation cost table (COST TABLE Il) <br /> Applied Earth Sciences,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.