Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of 6) <br /> XII.. LINE LEAK DETECTOR TESTING <br /> ❑Check this box if line leak detectors(LLD)are NOT installed.(Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? <br /> (Check all that apply.) Simulated leak rate verified: W]3 GPH ❑ 0.1 GPH ❑0.2 GPH ❑ ❑ <br /> Was the testing apparatus properly calibrated? ✓❑ ❑ ❑ <br /> For emergency generator tank systems,does the LLD create an audible and visual alarm when a leak is detected? ❑ ❑ Q <br /> For mechanical LLDs,does the LLD restrict the flow through the pipe when a leak is detected? ❑ ❑ W1 <br /> For electronic LLDs,does the turbine automatically shut off when a leak is detected? © ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? 10 ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? Q ❑ ❑ <br /> For electronic LLDs,have all accessible wiring connections been visually inspected for kinks and breaks? Q ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? 0 1 ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? ✓❑ I ❑ I ❑ <br /> For any answer of"M'above, describe in Section X111 how and when these issues were or will be corrected. <br /> XIII. COMMENTS <br /> 87 had 2 Turbines with PLLD's. <br /> XIV. VACUUM/PRESSURE/HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type(Mark all that apply.) ❑Vacuum ❑Pressure ❑Hydrostatic <br /> Sensor ID Component(S)Monitored By This Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> How was interstitial communication verified? ❑Simulated Leak at Far Ends of the Interstitial Space El Visual Inspection <br /> ❑Other(Describe the method in section XV below.) Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑Yes ❑No(Describe the reason in section XV below.) <br /> For any answer of"Fail"above,describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH=Gallons Per Hour,Y=Yes,N=No,NA=Not Applicable,VPH=Vacuum/Pressure/Hydrostatic,ID=Identification <br />