Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 3 of 6) <br /> IX. REMOTE FILL PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer Ide tify Tank ID from Section III for each Manufacturer <br /> A ❑ I B ❑ I C ❑ D ❑ <br /> A ❑ B ❑ I C ❑ I D ❑ <br /> Test Method Used: ❑Manufacturer Guidelines(Specify): <br /> ❑ Industry Code or Engineering Standard(Specify): <br /> ❑ Engineered Method(Specify): <br /> #of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Remote Fill Piping Containment Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> Interstitial Communication Verification Method Used: <br /> X. COMMENTS <br /> Provide any additional comments here. <br /> Section IX not applicable at this facility(no Remote Fills) <br /> XI. VENT PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Ameron A I B ❑X 1 C ❑x D ❑ <br /> A ❑ I B ❑ I C ❑ D ❑ <br /> Test Method Used: ❑ Manufacturer Guidelines(Specify): <br /> ❑x Industry Code or Engineering Standard(Specify): PEI RP1200 <br /> ❑Engineered Method (Specify): <br /> #of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. 3 <br /> Vent Piping Containment Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> Fiberglass Systems NOV 12/5/2021 <br /> Interstitial Communication Verification Method Used: <br /> For each run of secondary piping, pressure was released at one end & gauge drop observed in real time at the other <br /> XII. COMMENTS <br /> Provide any additional comments here. <br /> All vent line secondary piping was tested at 5 psi for 60 min <br /> ID=Identification <br />