Laserfiche WebLink
UNDERGROUNDSTORAGETANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 2 of 6) <br /> V. TANK SECONDARY CONTAINMENT INFORMATION <br /> Manufacturer Identi Tank ID from Section III for each Manufacturer <br /> Modern Weldinq A p I B 0 1 C Z D ❑ <br /> A ❑ I B ❑ I C ❑ I D ❑ <br /> Test Method Used: ❑Manufacturer Guidelines(Specify): <br /> ❑x Industry Code or Engineering Standard(Specify): PEI RP 1200 <br /> ❑Engineered Method(Specify): <br /> #of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. 5 <br /> Tank Containment Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> VI. COMMENTS <br /> Provide any additional comments here. <br /> Tank 2-91 and Tank 3-Diesel share same annular space, split tank configuration <br /> Both annulars tested at 10" HG for 60 min, passed <br /> VII. PRODUCT PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Western Fiberglass Co-Flex I A❑x I B ❑x C ❑x D ❑ <br /> A❑ I B ❑ I C ❑ I D ❑ <br /> Test Method Used: ❑Manufacturer Guidelines(Specify): <br /> ❑x Industry Code or Engineering Standard(Specify): PEI RP1200 <br /> ❑Engineered Method(Specify): <br /> #of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. 3 <br /> Product Piping Containment Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> Western Fiberglass 2/26/2021 <br /> Interstitial Communication Verification Method Used: <br /> For each run of secondary piping, pressure was released at one end &gauge drop observed in real time at the other <br /> VIII. COMMENTS <br /> Provide any additional comments here. <br /> All secondary product piping was tested at 5 psi for 60 min <br /> ID=Identification <br />