Laserfiche WebLink
30 June 2017 30 June 2017 <br /> AGE Project No.07-1529 AGE Project No.07-1529 <br /> Page 3 of 6 Page 4 of 6 <br /> • Volatile organic compounds including benzene, toluene, ethylbenzene and total For installation of soil-vapor wells,'/.-inch diameter,2-inch long polyethylene soil vapor <br /> xylenes(BTEX),and naphthalene in accordance with EPA Method 8260B;and implants and nine feet of%-inch Teflon®tubing will be lowered to the base of the borings; <br /> three feet of tubing will remain outside the boreholes for vapor sample collection. <br /> • Fuel additives including methyl tertiary butyl ether(MTBE),tertiary-butyl alcohol <br /> di-isopropyl ether (DIPE eta I tertiary-butyl ether ETBE tertia However,before installing the vapor implant and tubing,approximately six inches of#2/12 <br /> (TBA), ), y ( ), tertiary-amyl sand will be placed at the bottom of the boreholes for the vapor implants to be placed on. <br /> methyl ether(TAME)ethylene dibromide(EDB)and 1,2-dichloroethane(1,2-DCA) Once the six inches of sand,tubing and vapor implants are in place,the filter pack of <br /> in accordance with EPA Method 8260B. #2/12 sand will continue to be added from the bottom of the boreholes to approximately <br /> 4.5 feet bsg or approximately nine inches above the top of the vapor implants.Following <br /> Soil-vapor samples will be collected between 5 and 6 feet bsg and will be analyzed by a placement of the filter pack,approximately 12 inches of dry granulated bentonite will be <br /> CDPH-certified laboratory for the following constituents: placed atop the filter packs.The remaining annular space will be filled to near ground <br /> surface with a cement grout. The grout mixture will consist of Type 1/II Portland neat <br /> • Total petroleum hydrocarbons quantified as gasoline(TPH-g)in accordance with cement with approximately 3-5%bentonite content.A flush mounted well box will then be <br /> EPA Method TO-15; installed over the wells.Approximately,three feet of extra tubing will be run above ground <br /> for soil-vapor sample collection. A well construction diagram illustrating the proposed <br /> • BTEX,and naphthalene in accordance with EPA Method TO-15; design is included as Figure 3. <br /> • Fuel additives MTBE,TBA,DIPE,ETBE,TAME EDB and 1,2-DCA in accordance Once soil-vapor wells are installed, a minimum of 48 hours equalization time will be <br /> with EPA Method TO-15; <br /> observed prior to sampling the wells. <br /> • Percent oxygen(fixed gas)in accordance with analytical method ASTM D 1946- <br /> 90;and <br /> 3.2. SOIL SAMPLING <br /> • Tracer compound isopropyl alcohol in accordance with EPA Method TO-15. <br /> Soil samples will be collected at 5 feet bsg in the soil borings by hand-packing soil out of <br /> Laboratory reports for soil-vapor analyses (lowest possible detection limits), testing the hand auger bucket into steel sample sleeves.Following sample collection,the sample <br /> methods, laboratory quality assurance/quality control (QA/QC) reports, and sample sleeves will be covered with Teflon sheets,capped and sealed with tape. <br /> chain-of-custody documentation will be presented in a report with the findings and d Appropriately sealed and labeled samples will be placed in a chilled container under ice <br /> recommendations. Electronic deliverable format(EDF)files the laboratory analytical and transported under chain-of-custody procedure to a CDPH-certified laboratory. <br /> results will be submitted to the State of California GeoTracker database. Samples will be analyzed for the constituents listed in Section 2.3. Each sample will be <br /> labeled with boring designation, depth, time, date and sampler's initials. Soils <br /> 3.0. PROCEDURES encountered in the borings will be visually classified by AGE personnel in accordance <br /> with the Unified Soil Classification System(USCS).Additionally,soil samples will be field- <br /> All field procedures will be overseen by an AGE representative under the supervision of screened for presence of volatile organic compounds using an organic vapor meter <br /> a California Professional Geologist.Procedures for advancing soil borings,installation of (OVM), equipped with photo-ionization detector(PID; Mini Rae 3000)pre-calibrated to <br /> soil-vapor wells, collection and analysis of soil and soil-vapor samples, equipment isobutylene. <br /> decontamination and sample handling are presented below. <br /> 3.3. SOIL-VAPOR SAMPLING <br /> 3.1. SOIL-VAPOR WELL INSTALLATION Soil-vapor samples will be collected from the vapor wells using Summa canisters.For this <br /> AGE proposes to advance a total of two(2)pilot soil borings to 6.0 feet bsg for installation method, one six-liter Summa canister will be utilized for purging and each soil-vapor <br /> of depth discrete soil-vapor wells to evaluate the potential threat of vapor intrusion to the sample will be collected in a one-liter Summa canister.The sampling and purge canisters <br /> site building.Proposed soil borings will be advanced using a 3-inch diameter hand auger. will be connected together with a dedicated and serialized sampling inlet manifold.The <br /> sampling inlet manifold will consist of a vapor-tight valve;a particulate filter;a calibrated <br /> A&-a­,d GmEn Imn txl Inc. Ad.,,-d C-Envlmntn W I... <br />