My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2050
>
2900 - Site Mitigation Program
>
PR0545756
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 2:57:28 PM
Creation date
5/21/2020 2:51:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545756
PE
2960
FACILITY_ID
FA0025903
FACILITY_NAME
APACHE PLASTICS
STREET_NUMBER
2050
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
153130030
CURRENT_STATUS
01
SITE_LOCATION
2050 E FREMONT ST
P_LOCATION
01
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
30 June 2017 30 June 2017 <br /> AGE Project No.07-1529 AGE Project No.07-1529 <br /> Page 5 of 6 Page 6 of 6 <br /> flow restrictor,calibrated to 200 milliliters per minute(ml/min);a stainless-steel tee-fitting; 3.4. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT <br /> two vacuum gauges at either end of the flow controller and connections for both purge <br /> and sampling canisters(manifold assembly).The manifold assembly will be attached to Prior to use,all sampling tools used for sample collection will be thoroughly rinsed with <br /> the'%-inch Teflon®tubing from the vapor sampling locations.The purge canister will be clean water after being washed with a solution of Alconox.All boring advancement tools <br /> attached to the end of the sampling manifold while the sample canisters will be attached will be cleaned prior to advancement at each boring location.Any soil or water waste <br /> to the tee-fitting between the tubing and purge container. generated during field activities will be containerized in properly labeled DOT-approved <br /> 55-gallon drums, and stored on-site in an area lacking public access. Disposal <br /> Leak tests will be performed on each manifold assembly by attaching and securing the alternatives will be evaluated based on results of soil and water analysis. <br /> sample and purge canisters to the manifold and opening the valve on the purge canister <br /> and the manifold.The leak test will be performed for approximately 3-5 minutes on each <br /> assembly. 3.5. REPORTING <br /> Each soil-vapor sampling location will be isolated from ambient air by enclosing the Reporting of the investigation will be included in a report of findings.The report will include <br /> borehole,tubing and manifold/canister assembly in a 100-liter plastic shroud,which will a description of work performed and the results of sampling. Conclusions and <br /> be weighted at the surface.Isopropyl alcohol(IPA)as a liquid will be placed in a stainless- recommendations will also be included in the reports, if applicable. The report will be <br /> steel bowl within the plastic structure and allowed to volatilize into the air enclosed within reviewed and signed by a California Professional Geologist. <br /> the plastic structure surrounding the borehole, tubing and manifold/canister assembly. <br /> Field measurements will be collected from within the shroud, using an OVM(PID; Mini <br /> Rae 3000),during the process,and recorded to determine if sufficient tracer compound <br /> is present(detected as the starting values). <br /> Upon achieving a successful leak test, the purge canister valve will be opened for a <br /> calculated period of time to allow for a minimum of three calculated well-volumes of air to <br /> be purged. The purge canister vacuum gauge will be monitored to ensure a proper <br /> decrease of vacuum ensuring flow and purging.The purge volume will be determined by <br /> calculating the internal volume of the tubing and open borehole area. <br /> Upon achieving the targeted purge volume,the purge canister valve will be closed and <br /> the sample canister valve will be opened.The initial pressure and time will be recorded. <br /> Upon reaching at least-2 in Hg or less,the sample canister valve will be closed and final <br /> pressure and time recorded.The sampling port on the sampling canister will be capped <br /> with a brass end-cap. <br /> The samples will be transported under chain-of-custody procedure to a CDPH-certified <br /> laboratory.Each sample canister will be labeled with sample designation,time,date and <br /> sampler's initials and analyzed for the constituents listed in Section 2.3. <br /> Following sample collection,the total VOC concentration in the wells will be measured <br /> using an OVM(PID;Mini Rae 3000). <br /> Additional soil-vapor samples will be collected 4-6 months following the initial sampling if <br /> required by the CVRWQCB. <br /> Advmirrd G-Enriron m.]Inc. Advannd CcoEnv{mnmenlal Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.