Laserfiche WebLink
• TABLE OF CONTENTS <br /> Page No <br /> I• Executive Summary 1-1 <br /> II. Site Assessment History II-1 <br /> A Assessment History II-1 <br /> B Site Geology & Hydrocarbon Concentrations— Soil II-1 <br /> C Site Hydrogeology— Water Table Information II-2 <br /> D Hydrocarbon Concentrations —Groundwater II-2 <br /> E Regional Water Use II-3 <br /> III. Pilot Testing Activities III-1 <br /> A Pilot Testing Well Installation III-1 <br /> B Enhanced Bioremediation Pilot Testing III-2 <br /> C Air Sparging and Soil Vapor Extraction Pilot Testing III-2 <br /> D Recommended Remediation Technologies III-6 <br /> E Conclusions and Recommendations III-6 <br /> IV. Hydrocarbon Mass and Treatment Calculations IV-1 <br /> A Cleanup Goals IV-1 <br /> B Estimated Hydrocarbon Mass IV-1 <br /> C Estimated Cleanup Time for Target Objectives IV-2 <br /> D Estimated Costs To Achieve Target Objectives IV-2 <br /> V. Remediation System Design V-1 <br /> A Design Parameters V-1 <br /> B Proposed Remediation System Design and Layout V-1 <br /> C Remediation System Equipment V-3 <br /> D System Controls and Interlocks/Alarms V-4 <br /> E System Construction V-6 <br /> F Site Health and Safety V-7 <br /> G System Waste Removal V-7 <br /> H Contingency Plan V-g <br /> I Implementation Schedule V-g <br /> • <br /> i <br />