My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010337
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1500
>
3500 - Local Oversight Program
>
PR0545688
>
ARCHIVED REPORTS_XR0010337
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 3:39:54 PM
Creation date
5/21/2020 2:59:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010337
RECORD_ID
PR0545688
PE
3528
FACILITY_ID
FA0003634
FACILITY_NAME
CANTEEN CORPORATION
STREET_NUMBER
1500
Direction
N
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14326008
CURRENT_STATUS
02
SITE_LOCATION
1500 N SHAW RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS (continued) <br /> Pa2eNo. <br /> VI. Operation, Monitoring, and Performance Plan VI-1 <br /> A Analytical Requirements/Emissions Monitoring VI-1 <br /> B Emissions Permit Reporting Requirements VI-1 <br /> C System Start-Up VI-1 <br /> D System Performance Optimization VI-2 <br /> E System Performance Evaluation VI-3 <br /> F Site Health and Safety VI-3 <br /> VII. Closure Plan VII-1 <br /> A System Shutdown Determination VII-1 <br /> B Confirmation Sampling VII-1 <br /> C Site Closure Request VII-2 <br /> D System Decommissioning and Site Cleanup VII-2 <br /> • FIGURES <br /> Figure 1 — Topographical Site Location Map <br /> Figure 2 — Site Details <br /> Figure 3 --- Geologic Cross-Section Location Map <br /> Figure 4 — Geologic Cross-Section A—A' <br /> Figure 5 --- Geologic Cross-Section 13-13' <br /> Figure 6 — Hydrocarbon Concentration Map — Soil <br /> Figure 7 — Groundwater Elevations & Gradient Map (November 2001) <br /> Figure 8 — AS and SVE Well Locations with Radial Influence Perimeters <br /> Figure 9 — Remediation System Layout <br /> Figure 10 --- Piping and Conduit Layout <br /> Figure 11 — Typical AS and SVE Well Details <br /> Figure 12 — Details of AS and SVE Wellhead Plumbing <br /> Figure 13 — Remediation System—Process Flow Diagram <br /> Figure 14 — Remediation System—Piping & Instrumentation Diagram <br /> Figure 15 — Piping & Instrumentation— Symbols and Codes <br /> ti <br />
The URL can be used to link to this page
Your browser does not support the video tag.