Laserfiche WebLink
1. 5 Protection of the Site <br /> Excepting as otherwise provided herein, the Contractor shall <br /> protect all structures, walks, pipelines, trees, shrubbery, lawns, <br /> etc. , during the progress of his work. He shall also remove from <br /> the site all unused materials; and shall, upon completion of the <br /> work, restore the site as nearly as possible to its original <br /> conditions, including the replacement, at the Contractor' s expense, <br /> of any facility or landscaping which has been damaged beyond <br /> restoration. <br /> , - <br /> 1. 6 Disposition of Soils and Groundwater <br /> Soils (cuttings) produced as part of the drilling operation shall <br /> be placed on plastic and covered by plastic for disposition by <br /> Occidental. Groundwater produced as part of the well testing shall <br /> be directed to a location no further than 100 ' from the well site <br /> at the direction of the supervising geologist. Should container- <br /> ization of groundwater be required, it will be provided by <br /> Occidental. <br /> 1. 7 Subcontractors <br /> The Contractor shall include with his bid a list of subcontractors <br /> and the specific portion of the work each subcontractor is to <br /> perform. <br /> 1 - 10 <br />