My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_PART 1 FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2900 - Site Mitigation Program
>
PR0009015
>
WORK PLANS_PART 1 FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2020 2:11:25 PM
Creation date
5/26/2020 1:12:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
PART 1 FILE 1
RECORD_ID
PR0009015
PE
2960
FACILITY_ID
FA0004094
FACILITY_NAME
J R SIMPLOT (OCCIDENTAL CHEMICAL)
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19818005
CURRENT_STATUS
02
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/9 <br /> GECIVINMIX <br /> PROTOCOL <br /> DRILLING AND DESTRUCTION OF SOIL BORINGS <br /> 1.0 INTRODUCTION <br /> This protocol describes the procedures to be followed during drilling and destruction of soil <br /> borings. The soil borings will provide information about geologic conditions, soil engineering <br /> properties, and/or soil quality. If the soil boring is utilized for well installation, the well will be <br /> installed in accordance with the protocol INSTALLATION OF WELLS. <br /> The procedures presented herein are intended to be of general use and may be supplemented by a <br /> work plan and/or health and safety plan. As the work progresses and if warranted, appropriate <br /> revisions may be made by the project manager. Detailed procedures in this protocol may be <br /> superseded by applicable regulatory requirements. <br /> If required,permits for drilling of soil borings will be acquired from the appropriate agency(s) <br /> before drilling is initiated, and an underground utility check will be conducted before drilling <br /> begins. An underground utility-check will, at a minimum, consist of contacting a local utility <br /> alert service, if available. <br /> 2.0 DRILLING <br /> A DAILY FIELD RECORD will be completed for each day of fieldwork, and the original will <br /> be kept in the project files. <br /> The soil borings will be drilled using rotary,hollow stem auger, direct-push, or other appropriate <br /> method. In all rotary borings, compressed air will be filtered to remove oils before being <br /> circulated into the borehole. In mud rotary borings, appropriate drilling fluid additives, such as <br /> bentonite, will be used to maintain an open hole and to carry cuttings to the surface. However, <br /> organic drilling fluid additives will only be used with prior project manager approval. The <br /> DRILLING AND DESTRUCTION OF SOIL BORINGS Page 1 of 6 <br /> PROTO-DD.&c REVISION DATE-MARCH 1996 DD-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.