My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_PART 1 FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2900 - Site Mitigation Program
>
PR0009015
>
WORK PLANS_PART 1 FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2020 2:11:25 PM
Creation date
5/26/2020 1:12:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
PART 1 FILE 1
RECORD_ID
PR0009015
PE
2960
FACILITY_ID
FA0004094
FACILITY_NAME
J R SIMPLOT (OCCIDENTAL CHEMICAL)
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19818005
CURRENT_STATUS
02
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GE®M►T IX <br /> drilling mud will be circulated into a settling tank or basin located near the boring. The viscosity <br /> of the drilling fluid will be assessed periodically by the driller and will be controlled throughout <br /> the drilling operation to achieve the required results (hole stability, sample return, and mud cake <br /> thickness along borehole wall). Only potable water will be used as makeup water for drilling <br /> fluid. Exploratory borings drilled using the hollow stem auger method generally do not require <br /> the use of drilling fluid. If required,potable water from a municipal supply will be used to <br /> maintain boring stability. <br /> The planned depth of each soil boring will be determined by the project manager before drilling. <br /> The Geomatrix field geologist/engineer will specify to the drill rig operator the depth of soil <br /> sample collection, method of sample retrieval, and other matters pertaining to the satisfactory <br /> completion of the borings. Geomatrix staff will observe the volume of drill cuttings returned to <br /> assess whether significant cavitation has occurred. Drill cuttings, unused soil samples, and <br /> drilling fluids generated during drilling of soil borings will be stored properly for future disposal <br /> by the client, unless other arrangements have been made. <br /> The drill.rods, augers,hoses,bits, and other components that fluids and cuttings contact will be <br /> steam-cleaned before drilling each boring, as well as at the beginning of each project and at the <br /> completion of field activities. Drive samplers will be cleaned with Alconox and water or steam- <br /> cleaned before each sampling event. Only potable water from a municipal supply will be used <br /> for decontamination of drilling equipment. Decontamination rinsate will be collected and stored <br /> properly for future disposal by the client, unless other arrangements have been made. <br /> DRILLING AND DESTRUCTION OF SOIL BORINGS Page 2 of 6 <br /> PROTO-DD.doe REVISION DATE:MARCH 1996 DD-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.