My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_PART 1 FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2900 - Site Mitigation Program
>
PR0009015
>
WORK PLANS_PART 1 FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2020 2:11:25 PM
Creation date
5/26/2020 1:12:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
PART 1 FILE 1
RECORD_ID
PR0009015
PE
2960
FACILITY_ID
FA0004094
FACILITY_NAME
J R SIMPLOT (OCCIDENTAL CHEMICAL)
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19818005
CURRENT_STATUS
02
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE HEALTH & SAFETY PLAN <br /> 4.0 PRLNi IA.RY RESPONSIBIL=S <br /> 4.1 PROTECT MANAGER <br /> The Project Manager (PM) shall: <br /> 1. direct all Geomatrix personnel involved in investigative, monitoring, and remedial <br /> activities at the site and vicinity; <br /> 2. make the Project Health and Safety Officer aware of all pertinent project develop- <br /> ments and plans; <br /> 3. make available the resources that are necessary for a safe working environment; and <br /> 4. maintain communications with the client, as necessary. <br /> 4.2 PROTECT HEALTH AND SAFETY OFFICER <br /> The Project Health and Safety Officer(PHSO) shall: <br /> 1. direct all health and safety aspects of investigative, monitoring, and remedial. activi- <br /> ties conducted by Geomatrix personnel at the site and vicinity; <br /> 2. ensure that all Geomatrix personnel have received required training, are aware of the <br /> potential hazards associated with site operations, have been instructed in the work <br /> practices necessary for personal health and safety, and are familiar with the site <br /> Health and Safety Plan's procedures for all scheduled activities and for dealing with <br /> emergencies; <br /> 3. direct required exposure monitoring to assess site health and safety conditions; <br /> 4. prepare any accident/incident reports; <br /> 5. modify the site Health and Safety Plan as required based on accidents/incidents and <br /> findings regarding personnel exposures and work practices; and <br /> 6. report all accidents/incidents and findings regarding personnel exposure and work <br /> practices to the Project Manager. <br /> 4.3 SITE SAFETY OFFICER <br /> The Site Safety Officer (SSO) shall: <br /> 1. ensure that appropriate personal protective equipment is available for Geomatrix site <br /> personnel and enforce proper utilization of personal protective equipment by all on- <br /> site Geomatrix personnel; <br /> 2. with guidance from the PHSO, observe subcontractor's procedures with respect to <br /> health and safety. If the SSO believes that a subcontractor's personnel are or may be <br /> exposed to an immediate health hazard, the SSO shall suspend the subcontractor's site <br /> I:\PROJECn6741.00016741-07.doc 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.