Laserfiche WebLink
GEOMATWX <br /> SI'Z'E HEALTH & SAFETY PLAN <br /> work. If the subcontractor's personnel do not have required protective equipment; the <br /> SSO shall consult with the PM or PHSO before proceeding with the work; <br /> 3. implement the site Health and Safety Plan and report any observed deviations from <br /> site conditions anticipated in the Plan; <br /> 4. conduct site safety briefings as needed; <br /> 5. calibrate monitoring equipment daily and properly record and file results; <br /> 6. under direction of the PHSO, perform required exposure monitoring; <br /> 7. maintain monitoring equipment or arrange maintenance as necessary; <br /> 8. assume other duties as directed by the PM or PHSO; and <br /> 9. report observed accidents/incidents or inadequate work practices to the PHSO and the <br /> PM. <br /> 4.4 PROJECT PERSONNEL <br /> Project personnel involved in on-site investigations and operations shall: <br /> 1. take reasonable precautions to prevent injury to themselves and to their fellow em- <br /> ployees; <br /> 2. perform only those tasks that they can do safely and immediately report accidents <br /> and/or unsafe conditions to the SSO or PHSO; <br /> 3. follow the procedures set forth in the site Health and Safety Plan and report to the <br /> SSO or PHSO any observed deviations from the procedures described in the Plan on <br /> the part of Geomatrix or subcontractor personnel; and <br /> 4. inform the PM and PHSO of any physical conditions that might affect their ability to <br /> perform the planned field tasks. <br /> 4.5 TRAINING REQummms <br /> All project personnel must comply with OSHA regulations specified in 29 CFR 1910.120 and <br /> CCR Title 8, Section 5192. These include completion of a 40-hour health and safety training <br /> course, an annual 8-hour refresher training, and participation in Geomatrix Consultants' medical <br /> surveillance program and respiratory protection program. <br /> Additional site-specific training that covers on-site hazards, personal protection requirements, <br /> decontamination procedures, and emergency response Iinformation as outlined in this site Health <br /> and Safety Plan will be given by the PHSO or.SSO before beginning on-site work. Site-specific <br /> training briefings will be documented on a "Project Health and Safety Field Meeting Form" <br /> provided at the end of this Plan. We do not anticipate that field staff will be occupationally <br /> exposed to blood or potentially infectious materials during the course of this project. <br /> IAPROJEM6741.000\6741-07.doc 4 <br />