Soil Sampling Work Plan <br /> Stockton,CA-SJRRC Property Exchange C�) <br /> Assessor's Parcel Number 117-09-014 a ntea g ro u p <br /> Antea Group Project No. UPR8281A <br /> 2.0 PROPOSED SCOPE OF WORK <br /> Antea Group proposes to advance 20 soil borings to a depth of five (5) feet below ground surface (bgs) for the <br /> collection of soil samples.The locations for the hand auger borings are shown on Figure 2. <br /> In the northern portion of the property, borings HA-3 and HA-5 are situated to evaluate conditions near the former <br /> teepee incinerator. <br /> Borings in the southern portion of the property (HA-17 through HA-20) are tightly clustered due to previous <br /> focused investigation in this area, including numerous groundwater samples exceeding RBRGs, and the lack of <br /> available soil data(AMEC 2009). <br /> Remaining borings are situated to provide comprehensive data on the remainder of the site to assess current <br /> conditions as well as potential railroad worker exposure within the proposed property transfer area. <br /> 2.1 Pre Field Activities <br /> Prior to initiating field activities, Antea Group will prepare a Health and Safety Plan (HASP) in accordance with <br /> Title 8, Section 5192 of the California Code of Regulations. The HASP will contain a list of emergency contacts, as <br /> well as a map showing the route to the nearest emergency facility, and will be reviewed daily by field personnel. <br /> Antea Group will open an Underground Service Alert ticket and contact railroad specific utility locator services at <br /> least 48 hours prior to ground disturbance in order to locate all utilities beneath the work locations. Antea Group <br /> will obtain permits for soil borings,and will make all required notifications prior to commencing field work. <br /> 2.2 Soil Borings <br /> Soil borings will be advanced to a maximum of five feet using a hand auger operated by a licensed C-57 drilling <br /> contractor. Down-hole tools will be decontaminated between each boring by using a non-phosphate detergent <br /> and water wash,water rinse, initial deionized/distilled water rinse and final deionized/distilled water rinse, per the <br /> DTSC-approved Soil Management Plan,further discussed below in Section 2.4. <br /> Upon completion of each hand auger location,bores will be backfilled to grade with Portland cement. <br /> 2.3 Soil Sampling <br /> Surface soil samples from 0-0.5 feet bgs will be collected since railroad workers will have greatest exposure to <br /> surface soils, and surface soils are expected to contain the greatest concentrations of CDCs. Deeper soil samples <br /> from 4.5-5 feet bgs will also be analyzed in order to determine railroad worker exposure during trenching or <br /> digging onsite. Soil will be classified using the Unified Soil Classification System and logged onto soil boring logs. <br /> Soil from each boring will be field-screened using a Photoionization detector (PID). These readings will be <br /> 3 www.anteagroup.com <br />