Laserfiche WebLink
Work Plan to Install <br /> Additional Monitoring <br /> ARCADIS Wells <br /> Former OCC Lathrop Facility <br /> In addition to contacting USA, a private utility locator will be contracted to assess for <br /> locations of potential underground utilities(e.g., pipes, electrical conductors,fuel lines, <br /> and/or sewer lines)before intrusive work is performed. Each well location will be <br /> cleared to a depth of 5 feet bgs using air-knife or hand-digging methods to further <br /> evaluate for the presence of underground utilities. Proposed well locations may be <br /> adjusted in the field based on the presence of utilities. <br /> 3.1.2 Permits and Property Access <br /> A well installation permit will be obtained from the San Joaquin County Environmental <br /> Health Department(SJCEHD)before drilling activities begin. The wells will be installed <br /> in accordance with the SJCEHD Well Standards(SJCEHD 2005). Property access for <br /> installation of monitoring well clusters PW34, PW35, and PW36 and individual deep <br /> monitoring wells at clusters PW21 and PW25 will be negotiated with the property <br /> owner as necessary.The proposed well locations may be adjusted based on access <br /> requirements with the property owners. The RWQCB will be notified in the event an <br /> alternate location is selected due to access requirements. <br /> 3.2 Field Activities <br /> 3.2.1 Security Measures <br /> The work exclusion zone will consist of areas in the direct vicinity of each soil boring. <br /> Decontamination control zones(exclusion zone, contamination reduction zone, and/or <br /> support zone)will be established and demarcated in the field. <br /> The control zones will be identified during tailgate meetings, and entrance and exit to <br /> the exclusion zone will only be through controlled access points established for each <br /> work area. A visitor log will be maintained by on-site ARCADIS personnel. <br /> 3.2.2 Well Installation <br /> Proposed locations of the 16 additional monitoring wells are presented on Figure 2. <br /> Proposed well construction details including screen intervals are presented in Table 1. <br /> The proposed screen intervals and well construction details are approximate and may <br /> be adjusted based on field conditions. The four new monitoring well clusters(PW33 <br /> through PW36)will each consist of three monitoring wells.The two shallower depth <br /> wells within each new proposed cluster will be constructed as nested wells within one <br /> borehole. Additionally,four deep wells will be installed at existing clusters(PW01, <br /> 2014.03.13 mw inslallawn Nod plen_F—Ldoc 2 <br />