My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_PART 2 FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2900 - Site Mitigation Program
>
PR0009015
>
WORK PLANS_PART 2 FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2020 2:29:55 PM
Creation date
5/26/2020 1:27:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
PART 2 FILE 1
RECORD_ID
PR0009015
PE
2960
FACILITY_ID
FA0004094
FACILITY_NAME
J R SIMPLOT (OCCIDENTAL CHEMICAL)
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19818005
CURRENT_STATUS
02
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Work Plan to Install <br /> Additional Monitoring <br /> ? ARCADIS Wells <br /> Former OCC Lathrop Facility <br /> 4. Schedule and Report <br /> Upon receiving approval from the RWQCB for this work plan,ARCADIS will initiate <br /> proposed pre-field and field activities.The field schedule will be dependent on the <br /> availability of access agreements and may be completed in several mobilizations. <br /> ARCADIS will notify the RWQCB prior to well installation and if multiple mobilizations <br /> are required to complete the well installation. Following the completion of the proposed <br /> field activities,ARCADIS will prepare a summary report and submit a copy of the report <br /> to the RWQCB. The report will summarize field procedures and observations and <br /> include boring logs,well construction, and well development details.The report will be <br /> submitted to the RWQCB approximately 8 weeks after the completion of well <br /> development activities. The newly installed wells will be sampled in accordance with <br /> Site MRPs(R5-2004-0800 and R5-2012-0106)during the next routine monitoring <br /> event. Results of groundwater sampling from the wells will be included in the <br /> semiannual groundwater monitoring reports prepared for the Site. <br /> 5. References <br /> ARCADIS U.S., Inc. 2013. Site-Specific Health and Safety Plan, Former Occidental <br /> Chemical Corporation Facility, Lathrop, California. February 4. <br /> San Joaquin County Environmental Health Department. 2005.Well Standards, <br /> Standards for Well Construction&Destruction in San Joaquin County. February. <br /> 2014,03,13—installation—,k plan_fi-Ldo 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.