Laserfiche WebLink
Phase II Site Assessment Workplan/Health and Safety Plan October 1996 <br /> for the Lodi Rail/Multimodal Station Project No. E168-1 <br /> Laboratory Analyses <br /> Since the type(s) of contamination that may be present are generally unknown at this time, <br /> type of analysis will be determined following exploration. Considering that fuels, oils, and <br /> or solvents are anticipated analyses would include: total petroleum hydrocarbons for gas <br /> (EPA8020), total petroleum hydrocarbons for diesel and motor oils (mod. EPA8015), and <br /> halogenated hydrocarbons (EPA8010), Cam 8 metals (EPA 6010, Total Threshold Limit <br /> Concentrations). A two week sample turn-around time is standard. <br /> Anticipated Subcontractors <br /> Drilling Contractor - All Terrain Exploration Drilling <br /> 6330 Brewer Road <br /> Pleasant Grove, CA 95668 <br /> Trenching - Jim Thorpe Oil Inc. <br /> P.O. Box 357 <br /> Lodi, CA 95241-0357 <br /> Laboratories - Excelchem <br /> 500 Giuseppe Court, Suite 9 <br /> Roseville, CA 95678 <br /> Sequoia Analytical <br /> 819 Striker Ave., Suite 8 <br /> Sacramento, CA 95834 <br /> 5 <br /> `� ESPANA GEOTECHNICAL CONSULTING <br />