My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013318
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
30801
>
2600 - Land Use Program
>
SU-87-21
>
SU0013318
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 1:32:32 PM
Creation date
5/26/2020 3:50:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013318
PE
2600
FACILITY_NAME
SU-87-21
STREET_NUMBER
30801
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
Zip
95376-
APN
25511042
ENTERED_DATE
5/21/2020 12:00:00 AM
SITE_LOCATION
30801 S KOSTER RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"I - A Professional Corporation <br /> 900 "H" ST., SUITE G - R O. BOX 816 - MODESTO, CA 95353 <br /> (209) 526-4214 - FAX (209) 526-0803 <br /> February 25, 1989 V <br /> MAR 132 198-0 <br /> New Jerusalem Drainage District ENV:'�0r',;!ML::NT!AL 1-JEALTFI <br /> V 0 0 W . Linn e Road P'E'RMIY/SERVICES <br /> Tracy, California 95376 <br /> Attn : Mr . John Paulsen <br /> Re : Hempstead Court Subdivision <br /> Dear Sir: <br /> Enclosed are two ( 2 ) sets of plans and details for a proposed <br /> "Tile Drain" connection to the New Jerusalem Drainage District ' s 18 " <br /> collector line on Koster Road at the Hempstead Court subdivision . <br /> We plan to install approximately 1 , 050 L . F . of 8 " perforated <br /> plastic pipe in a gravel backfill approximately 4 ' to 10 ' deep . it <br /> will connect to approximately 239 L . F . of 8" ( non perforated) plastic <br /> irrigation pipe and then to a 10" asbestos cement pipe which crosses <br /> Koster Road and connects to an existing 36" junction structure on the <br /> East side of the road . <br /> The attached detail 'shows our anticipated method of connection to <br /> the existing system . It is intended that Mr . Ike McElvany will do the <br /> construction . The "on-site" system will be maintained by a newly <br /> formed Home Owner' s Association and will be constructed in accordance <br /> with the attached "Construction Requirements for Tie-in to New <br /> Jerusalem Drainage District Pipelines . " We anticipate inspection during <br /> construction by your field personnel and the U . S . Soil Conversation <br /> Service . <br /> It is our desire to begin construction by March 1 , 1989 . Please <br /> contact me at your earliest convenience if you have any questions, <br /> comments, or concerns whatsoever . <br /> Sincerely, <br /> M1D-VALLEY ENGINEERING, INC . <br /> Al Toschi <br /> R . C . E . 26654 <br /> AT : sm <br /> (paulsen225) <br /> cc : Ike Mcelvany/McElvany Inc . Rich Pauisen/Sassco Realty Co . <br /> Walt McGinnis\N . J . D . D . Richard Cleveland, Sycamore D . C . <br /> Bob Stroud\U . S . SCS Pete Martin, San Joaquin Co . <br /> J <br />
The URL can be used to link to this page
Your browser does not support the video tag.