Laserfiche WebLink
2 <br /> ZR-91-13 AND RV-88-2 <br /> MITIGATION MONITORING PROGRAM <br /> TOWER PARK MARINA <br /> IMPACTMITIGATION' MONITORING PROGRAM RESPONSIBILITY TIMING <br /> EARTH RESOURCES <br /> Soil and levee A report from a When building plans Building Building permit <br /> su idence & California are submitted they Inspection Div. plan checking. <br /> sei_z:�mically- certified will be reviewed to <br /> induced engineering determine if they <br /> liquefaction geologist regarding incorporate <br /> impact soil stability, engineering report <br /> structures & structural support recommendations. <br /> infrastruc- and design safety <br /> ture. shall be prepared <br /> for each structure <br /> and be incorporated <br /> into building <br /> plans. <br /> TRAFFIC <br /> LOS of F for Pay for traffic Payment for signals Caltrans Prior to <br /> left turn signal at entrance to State. initiation of <br /> me ments and contribute for use. <br /> leaving resort signals at I-5 and <br /> and from I-5 SR 12 subject to <br /> southbound off- approval by <br /> ramp to east- Caltrans. <br /> bound SR 12 . <br />