Laserfiche WebLink
1 <br /> ZR-91-13 AND RV-88-2 <br /> MITIGATION MONITORING PROGRAM <br /> TOWER PARK MARINA <br /> IMPACT MITIGATION MONITORING PROGRAM RESPONSIBILITY TIMING <br /> AIR QUALITY <br /> During const. During construction Periodic site Development Sery Periodically <br /> dust levels may contractor shall be inspections during Division and Air during const. <br /> in—ease. required to water construction. Pollution Control period. <br /> any excavated area. Dist. <br /> Weed control shall <br /> be by mowing rather <br /> than discing. <br /> Increases in Reduce traffic Road improvements Public Works and Prior to the <br /> boat, and auto congestion at the to be inspected. Development establishment of <br /> traffic will entrance. Services Div. the additional <br /> degrade air uses. <br /> quality. <br /> Extensive planting Landscaping plans Development Prior to <br /> of plants that to be reviewed and Services Div. installation an <br /> remove particulate approved. prior to <br /> material. establishment of <br /> uses. <br /> Lr. J USE <br /> CONFLICTS <br /> Recreation vs Fences shall be Inspection of Development Prior to <br /> agriculture and installed between fences. Services Div. establishment of <br /> recreation vs camping areas and uses. <br /> mobile home ag land and mobile <br /> park. home park. <br />