My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SPRECKELS
>
600
>
2900 - Site Mitigation Program
>
PR0536559
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 4:10:37 PM
Creation date
5/27/2020 3:47:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0536559
PE
2950
FACILITY_ID
FA0020990
FACILITY_NAME
MET LIFE INSURANCE
STREET_NUMBER
600
STREET_NAME
SPRECKELS
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22125005
CURRENT_STATUS
01
SITE_LOCATION
600 SPRECKELS AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
hTJ KLEINFELDER <br /> 4 ACTIVITIES CONDUCTED <br /> Kleinfelder observed debris removal from Sites B and C located on the southeastern portion of <br /> the former Spreckels Plant, also known as the former Grover Area (see Plate 3). Approximately <br /> 5,000 yards of soil and debris was excavated frons Site B and 10,000 yards from Site C. <br /> Groundwater was encountered at both sites at depths of G to 9 feet below ground surface (bgs). <br /> During excavation activities two �11roundwater and one soil sample were collected from Site B <br /> and six soil samples were collected From Site C. A total of' two groundwater and three soil <br /> samples were analyzed for selected analytes. <br /> After excavation of the debris areas. an attempt was made to destroy six monitoring well in the <br /> vicinity of the disposal areas. Three of the monitoring wells were destroyed and three were not <br /> able to be located due to construction activities. <br /> 4.1 EXCAVATION OF 1WBRIS <br /> On .lune 1 i to June 18- 19911 Disposal Sites B and C were excavated by DSS Company Inc <br /> (DSS). Mr. Joe Zilles. a I`leinielcler geologist observed the excavation activities. Mr. Robert <br /> McCollum of the Solid Waste Section of the PHS/EHD was the onsite inspector. For locations <br /> of the disposal areas refer to Platc 3. <br /> 4.1.1 Excavation ot'Disposal Site 13f <br /> Site B was an eloll<<ated oval-shaped excavation approximately 270 feet long and 50 feet wide by <br /> an average of 12 feet deep. 1-he maximum depth of the excavation in relatively small areas was <br /> 20 feet bgs. Approximately 5.000 cubic yards of soil/debris was removed. Debris included <br /> plastic sheeting, Avood. wire. concrete and wood. Mr. Rod Getty, supervisor from DSS estimated <br /> that debris at this location was approximately 1 percent by volume. Concrete was estimated to <br /> be about 70 percent of the debris material. A strip of slaked time was observed near the <br /> southeastern portion of the excavation measuring 150 feet long and 15 feet wide. The slaked <br /> Mille was encountered at deliths ranging from 8 to 10 feet bgs. Mr. Getty estimated that <br /> approximately 25 I)ercent by \'olt1me was slaked lime or lime material. <br /> Soils enc:ountercd included silt ,trul clayey silt with slaked lime material. A small area of <br /> apparently discolored dart: gray material was noted just above the slaked lime with a strong <br /> organic odor. A greenish-gliv colored soil .was noted below the slaked lime at depths ranging <br /> from 10 to 20 bgs. fhCSC COIN'S SUPr01111d111f) the lithe was common In their occurrence In other <br /> 211-3978-03.W36120l 97A6 Page 9(11,20 <br /> © 1999.Kleinlcklcr.lnc. September 9. 11999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.