My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
1252
>
3500 - Local Oversight Program
>
PR0545699
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 9:55:52 AM
Creation date
5/28/2020 9:52:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545699
PE
3528
FACILITY_ID
FA0010903
FACILITY_NAME
CSU STANISLAUS MULTI CAMPUS REGIONA
STREET_NUMBER
1252
Direction
N
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13921008
CURRENT_STATUS
02
SITE_LOCATION
1252 N STANISLAUS ST
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- <br /> Work Plan—Additional Soiland Groundwater Investigation <br /> CSUS .Multi-Campus:Regional Center <br /> _. . <br /> -October er S,g 001 <br /> — -- _ - Pae - <br /> 6.0 SENSITIVE-RECEPTOR SURVEY <br /> rA sensitive receptor-survey(SRS)will be-conducted that-encompasses a-.2,.000-foot radius-of the site and <br /> 1.r includes-a field;feconnaissance within 500 feet of the-site: .The SRS will ;include__Inquiry_relative to <br /> existing water supply wells to the Department of--Water-=Resources (DWR) and local water purveyor(s) <br /> serving the survey,-area.-.The_ SRS will also=include identification of;surface'waterbodies,.`"schools, and - <br /> other potential receptors w.ithiri the 2,000-foot radius - <br /> 7.0 REPORTING - <br /> activities will be- re ared .and submitted. the (SUS. At a <br /> _ A report-describing the investigation _ _p :p _ <br /> minimum the report will include: (1) a discussion of the-site history, (2)-a description-of the-fieldwork-conducted at the site, (3) the-laboratory results, (4)=a scaled site-plan, (5) drilling logs,-(6)_conclusions, <br /> and(7) recommendations. - = ------ - <br /> r 8.0 PROJECT SCHEDULE <br /> Upon approval of the work-plan by the CSUS,the'field portion of the investigation can be completed within <br /> approximately six:to eight weeks. The turn-around time for laboratory analyses is approximately two.weeks. <br /> A report can be-submitted within three weeks of receipt of the-laboratory analyses If you need additional <br /> information or have any questions,please call us at_(209)234=0518. -- - <br /> rrRespectfully_S_11-braitied,- <br /> CONDOR EARTH TECHNOLOGIES,INC. <br /> ,\BRED <br /> LV&-�- � <br /> - ft ism 4 <br /> Lee H Morse onald E_ Kresse <br /> Staff Geologist 9� - ahfornia Registered <br /> OF CAL\F� Geologist#6430 <br /> P:\3024 CSUS-Multi-Campus\Work PlaTRAddil S&GW Inv Work Plan.doc _--- <br /> L <br /> L� <br /> ND <br /> _ CO OR <br />
The URL can be used to link to this page
Your browser does not support the video tag.