Laserfiche WebLink
• Case Closure Summary Page 2 <br /> Leaking Underground Fuel Storage Tank Program <br /> III. Release and Site Characterization Information (continued) <br /> Maximum Documented Contaminant Concentrations-- Before and After Cleanup <br /> Contaminant Soil Before (ppm) Water (ppm) Contaminant Soil Before (ppm) Water (ppm) <br /> After Before After After Before After <br /> TPH (Gas) 77.0 <1.0 0.067* 0.055* Xylenes <0.025 NA <0.0005 <0.0005 <br /> TPH (Diesel) 2,000 <1.0 <0.05 <0.05 Ethylbenzene <0.025 NA <0.0005 <0.0005 <br /> <0.1 <0.1 <br /> <0.0005 <0.0005 Oil&Grease NA <10 <br /> Benzene <0.025 NA <br /> Toluene <0.025 NNA NAA <0.0005 <0.0005 Heavy Metals 6.4 (Pb) NA NA NA <br /> MTBE <0.025 NA <br /> F <br /> omments: LEAD RESULT FROM SOIL STOCKPILE SAMPLE; ALL OTHER SOIL 'BEFORE' DATA FROM TANK PIT <br /> AMPLE TW-13; SOIL 'AFTER' DATA FROM SOIL BORING B-1. GROUNDWATER DATA FROM MW-1 ON 1117111 AND <br /> 18111. *LABORATORY REPORT INDICATES PRIMARILY COMPOUNDS NOT FOUND IN TYPICAL GASOLINE. <br /> IV. Closure <br /> Does completed corrective action protect existing beneficial uses per the Regional Board Basin Plan?YES <br /> Does completed corrective action protect potential beneficial uses per the Regional Board Basin Plan? YES <br /> Does corrective action protect public health for current land use? YES <br /> Site management requirements: NONE <br /> Should corrective action be reviewed if land use changes?YES <br /> MonitoringNapor wells decommissioned: NO Number Decommissioned: 0 Number retained: 1 <br /> List enforcement actions taken: NOR <br /> List enforcement actions rescinded: NONE <br /> V. Local Agency Representative Data <br /> Name: ADRIENNE ELLSAESSER, REHS Title: ACTING PROGRAM COORDINATOR, UNIT IV <br /> Signature: fyDate: <br /> VI. Central Valley Regional Water Quality Control Board (RB) Notification <br /> Date Submitted to RB: Response Date: <br /> RB Staff: JAMES L.L. BARTON, PG Response: <br /> Title: ENGINEERING GEOLOGIST <br /> VII. Additional Comments, Data, etc. <br /> This document and the related CASE CLOSURE LETTER shall be retained by the lead agency as part of the official site file. <br />