My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
239
>
3500 - Local Oversight Program
>
PR0545701
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 10:26:06 AM
Creation date
5/28/2020 10:22:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545701
PE
3528
FACILITY_ID
FA0000720
FACILITY_NAME
MADSENS SUNRISE DAIRY
STREET_NUMBER
239
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25927805
CURRENT_STATUS
02
SITE_LOCATION
239 S STOCKTON ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ig6ETTLER - RYAN INC. <br /> REC EE-3 <br /> July 22, 2010 JUL 2 6 1010 <br /> ENVIRONMENT HEACM <br /> Ms. Lori Duncan PERMIT/SERVICES <br /> San Joaquin County <br /> Environmental Health Department <br /> 600 East Main Street <br /> Stockton, CA 95202-3209 <br /> Subject: Suspension of Test Pit Scope of Work <br /> City of Ripon/Madsen Sunrise Dairy <br /> 239 South Stockton Street <br /> Ripon,California. <br /> Ms.Duncan: <br /> At the request of the City of Ripon, Gettler-Ryan Inc. (GR) has prepared this letter to document <br /> the recent agreement between the City of Ripon and the San Joaquin County Environmental <br /> Health Department (SJCEHD) suspend the test pit scope of work at the subject site. This scope <br /> of work was approved by the SJCEHD in a letter to the City of Ripon dated June 21, 2010. The <br /> test pit scope of work is being suspended until the four proposed Geoprobe soil borings (also <br /> approved by the SJCEHD June 21, 2010)are completed and the analytical data is reviewed. <br /> GR concurs with the suspension of the test pits and is currently scheduling and permitting the <br /> Geoprobe soil borings. We will provide the SJCEHD with advance notification of the scheduled <br /> field work. <br /> If you have any questions, please contact me in our Dublin Office at(925) 551-7444, extension <br /> 123. <br /> Sincerely, <br /> Gettler-Ryan Inc. <br /> ` L <br /> Dou as Lee, PG <br /> Project M nager <br /> cc: Mr. James Pease—City of Ripon <br /> 140193.113747 Sierra Court, Suite J • Dublin, CA 94568 • (925) 551-7555 • Fax (925) 551-7888 <br /> 3140 Gold Camp Drive, Suite 170 • Rancho Cordova, CA 95670 • (916) 631-1300 • Fax (916) 631-1317 <br />
The URL can be used to link to this page
Your browser does not support the video tag.