Laserfiche WebLink
i <br /> Site Background Information Sutter Office Center <br /> Page 2 of 7 <br /> PREVIOUS SITE ASSESSMENTS <br /> Ten soil borings have been advanced and three ground water monitoring wells have been installed <br /> at the site to assess the vertical and lateral extent of Impacted soil and ground water The following <br /> is a summary of milestone events at the site <br /> On 22 May 2000, a total of seven on-site soil borings were established by Hydro-Geo Consultants, <br />' Inc with a Geoprobe sampling rig Borings A, B, and C were established on the northeast corner <br /> of the site and borings D through G were established on the west and southern edge of the former <br /> service station location, to a depth of 45 feet below surface grade (bsg) Based on laboratory <br /> Ianalysis <br /> • Total petroleum hydrocarbons quantified as gasoline and diesel (TPH-g and TPH-d) were <br /> detected in soil samples collected during boring operations at concentrations as high as <br /> 300 milligrams per kilogram (mg/kg) and 2,400 mg/kg, respectively, in the sample from <br /> I boring A at 30 feet bsg BTEX compounds were detected in the soil samples at maximum <br /> concentrations of 0 5 mg/kg (toluene), 1 5 mg/kg (ethylbenzene), and 30 mg/kg (xylenes) <br /> in the sample from boring A at 40 feet bsg <br /> • TPH-g and TPH-d were detected in grab ground water samples collected during the soil <br /> boring operations at concentrations as high as 470,000 micrograms per liter (µg/1) and <br /> 230,000 µg/l,respectively,in the sample from boring A Dissolved BTEX compounds were <br />' detected at maximum concentrations of 1,900 µg/l benzene, 4,100 µg/l toluene, and <br /> 3,600 µg/l ethylbenzene in sample A, and 35,000 �Ig/l xylenes in sample B <br /> IOn 02 August 2001, three ground water monitoring wells (MW-1, MW-2, and MW-3), screened <br /> between 20 and 40 feet bsg, were installed at the site (Figure 2) Well MW-1 was installed at the <br />' northeast corner of the site and wells MW-2 and MW-3 were installed at the southern edge of the <br /> dissolved plume area Eight ground water monitoring events have occurred to date, the last one in <br /> July 2004 <br />' On 31 January 2002,three additional soil probe borings were advanced,two borings were advanced <br /> on-site to a depth of 90 feet bsg(I and J),while boring H was established off-site across California <br />' Street to a depth of 50 feet bsg Laboratory analysis indicated <br /> • TPH-g and TPH-d were detected in grab ground water samples collected during the soil <br />' boring operations at concentrations as high as 120,000 µg/1 and 190 µg/l,respectively,in the <br /> sample from boring J at a depth of between 46 and 50 feet bsg Dissolved BTEX compounds <br /> were detected at maximum concentrations of 650 µg11 benzene in sample I at a depth of <br />' between 46 and 50 feet bsg, and 9,000 µg/l toluene,2,900 µg/l ethylbenzene, and 9,000 µg/l <br /> xyleries in sample J at a depth of between 46 and 50 feet bsg <br /> Advanced GeoEnvironmental,Inc <br /> I <br />