Laserfiche WebLink
f <br /> Mobil Oil Corporation KEI--P86-084 <br /> Page 2 August 27 , 1986 <br /> Estimated Budget- <br /> Work will be performed on a time and materials basis in <br /> accordance with KEI ' s current schedule of charges . Based 9n this <br /> we estimate that our charges would be between � to <br /> The estimated budget will not ,be exceeded without prior <br /> authorization from Mobil Oil Corporation. <br /> Should you have any questions regarding this proposal please do <br /> not hesitate to call me. <br /> i <br /> Sincerely , <br /> Kaprealian Engineering, Inc . <br /> Mardo Kaprealian I <br /> Mk/aa <br /> Attachment : Location Map <br /> cc : C. Galloway <br /> , <br /> a <br /> 1 <br />