My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2900 - Site Mitigation Program
>
PR0505512
>
WORK PLANS_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 12:37:44 PM
Creation date
5/28/2020 12:34:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 1
RECORD_ID
PR0505512
PE
2950
FACILITY_ID
FA0006827
FACILITY_NAME
BP/MOBIL SERVICE STATION
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
02
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cv�1 <br /> IMPLEMENTATION SCHEDULE <br /> f The investigative study proposed herein will be conducted in <br /> accordance with the schedule set forth below. Part 1 will <br /> not commence until after receipt of written approval of the <br /> proposed scope of work from the regulatory agencies . The <br /> schedule for completion of major activities or tasks under <br /> each part is as follows : <br /> E ima Days <br /> Activity After W rk Plan Approryal <br /> Qualitative Water Survey 15 <br /> Aquifer Testing and Analysis 20 <br /> Drilling and Sampling 30 <br /> Well Development and Survey 35 <br /> Sampling and Analysis 50 <br /> Data Analysis 80 <br /> Remediation Feasibility Study 95 <br /> Report Preparation 110 <br /> The above schedule may be subject to revision depending on <br /> timely receipt of work plan approval and information required <br /> to complete the site investigation. Any changes to the <br /> schedule will be communicated in advance to the appropriate <br /> agencies and parties involved. <br /> The schedule for Part 2 will be established atter Part 1 has <br /> been completed and the nature of ground water contamination <br /> has been determined and defined. <br /> 4 <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.