My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2900 - Site Mitigation Program
>
PR0505512
>
WORK PLANS_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 12:37:44 PM
Creation date
5/28/2020 12:34:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 1
RECORD_ID
PR0505512
PE
2950
FACILITY_ID
FA0006827
FACILITY_NAME
BP/MOBIL SERVICE STATION
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
02
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t i 7 <br /> PROPOSAL FOR REMEDIATION SERVICES <br /> �.� MOBIL SERVICE STATION 410-NP4 <br /> _w TRACY, CALIFORNIA <br /> Task 3 - Installation of Enhanced Soil and Groundwater <br /> Treatment System <br /> We propose to perform this work on a lump sum basis. However, <br /> until we have the additional information from task 1, the <br /> final design and cost of the treatment system cannot be <br /> developed. <br /> For budgeting purposes, we have provided a cost estimate based <br /> g g <br /> upon a conceptual design. This conceptual design is based <br /> upon current site information. <br /> Task 4 - Permitting <br /> We propose to perform this task on a time and expense basis. <br /> The cost shown does not include the actual cost of the <br /> permits. Hart Crowser's charges in support of permitting <br /> activities are estimated to be $1, 000 to $3 , 000. <br /> Task 5 - Regulatory Negotiations and Interaction <br /> This work will be performed on a time and expense basis as <br /> described in Task 3 . <br /> Task 6 - Operations, Maintenance,_ and Monitoring <br /> This work will be performed on a flat monthly rate basis for <br /> the items shown in Table 1. Equipment rental items include <br /> the air stripper, pumps, level controls and valving, and air <br /> compressor. The maintenance and monitoring cost includes all <br /> routine maintenance, system observations, laboratory testing, <br /> and monthly report. We have assumed that Mobil will bear the <br /> monthly power costs directly.. <br /> The Operations, Maintenance, and Monitoring cost is an <br /> estimate and is based upon the conceptual design in this <br /> proposal. This estimate is to be used for budgeting <br /> purposes. Upon completion of task 1 and finalization of the <br /> treatment system design, a flat monthly Operations, <br /> Maintenance, and Monitoring rate will be developed. <br /> i <br /> -10- <br />
The URL can be used to link to this page
Your browser does not support the video tag.