My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2900 - Site Mitigation Program
>
PR0505512
>
WORK PLANS_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 12:37:44 PM
Creation date
5/28/2020 12:34:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 1
RECORD_ID
PR0505512
PE
2950
FACILITY_ID
FA0006827
FACILITY_NAME
BP/MOBIL SERVICE STATION
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
02
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> PROPOSAL FOR REMEDIATION SERVICES <br /> �= MOBIL SERVICE STATION #10-NP4 <br /> TRACY, CALIFORNIA <br /> I <br /> Task 6 - Operations, Maintenance, -_a_nd Monitoring <br /> For the duration of operation of the groundwater recovery and <br /> treatment system, the site will be visited at least weekly, <br /> and more often during the early months of operation. During <br /> the site visit, the system components will be observed for <br /> proper operation and any needed adjustments will be <br /> performed. Routine maintenance will be performed on the <br /> various system components. <br /> i <br /> Once monthly, a sample will be obtained of the groundwater <br /> pumped and the water from the air stripper effluent. These <br /> samples will be analyzed for BTEX to determine the effect of <br /> the remediation activities on groundwater quality. Soil <br /> samples may be taken on a quarterly basis and analyzed for <br /> BTEX. <br /> The results of this task will be summarized in a monthly <br /> letter to you. <br /> t <br /> COSTS <br /> Estimated costs for the project are summarized in Table 1. i <br /> Assumptions and the basis of these costs are presented on a <br /> task by task basis below. <br /> Task 1 - Additional Information and Preparation of Site <br /> Remediation Work Plan <br /> We propose to perform this work .on a lump sum basis for the <br /> amount shown in Table 1. This cost includes resampling of the <br /> groundwater monitoring wells, percolation test, soil <br /> permeability tests, final design of treatment system, and <br /> development of the Site Remediation Work Plan. <br /> Task 2 -- Excavate and Dispose of Contaminated Soil <br /> We propose to perform this work on a time and expense basis. <br /> The cost shown does not include disposal costs. Hart Crowser <br /> charges are estimated to be -$3 , 000. <br /> -9- <br />
The URL can be used to link to this page
Your browser does not support the video tag.