Laserfiche WebLink
AM <br /> ATTACENENT. B <br /> DETAILED COST ESTIMATE <br /> Task 1 -- Additional Information and Finalization of Treatment <br /> System Design <br /> Engineering Fees: <br /> Labor $10, 450 <br /> Direct Costs 2 , 750 <br /> I <br /> $13, 200 <br /> i <br /> Subcontractor Fees: <br /> Analytical $ 51550 <br /> Drillers 3 , 250 <br /> _iS_8�800_ <br /> $22 , 000 <br /> Task 2 - Install Groundwater Treatment System <br /> Engineering Fees: <br /> Labor $20,775 <br /> Direct Costs 5, 290 <br /> i <br /> $26, 065 <br /> Subcontractor Fees: <br /> Plumbing $ 1, 500 <br /> Electrical 2 , 500 <br /> Backhoe 1, 800 <br /> Drilling 5, 000 <br /> Analytical 1, 000 <br /> $11, 800 <br /> Material Costs: <br /> Fencing, Backfill, Piping, etc. $10,450 <br /> _1_ <br />