My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2900 - Site Mitigation Program
>
PR0505512
>
WORK PLANS_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 12:37:44 PM
Creation date
5/28/2020 12:34:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 1
RECORD_ID
PR0505512
PE
2950
FACILITY_ID
FA0006827
FACILITY_NAME
BP/MOBIL SERVICE STATION
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
02
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Well design and construction will be in accordance <br /> with SJCEHD and RWQCB guidelines . The top of each <br /> well shall be secured with locking caps and <br /> christy boxes finished flush with the ground <br /> surface . <br /> Task 1 .5 : Develop. -Sample, n ry Monitaring Wells <br /> The additional monitoring wells will be properly <br /> developed and sampled, in accordance with SJCEHD <br /> and RWQCB guidelines . Water samples will be <br /> collected from each of the wells and placed in <br /> sterile containers for transport to a <br /> state-certified laboratory for analysis . <br /> All the additional wells will be surveyed as to <br /> location and elevation in reference to an <br /> established benchmark or a common datum to within <br /> 0 . 01 foot. Water level at each well will be <br /> measured as well as any free floating product . <br /> Task 1 . 6: Water Sam-oles <br /> Soil and ground water samples will be transported <br /> to a state certified laboratory for analysis <br /> following proper chain of custody procedures. <br /> Soil samples will be analyzed for TPH as gasoline <br /> with BTEX distinction, by EPA method 8015/8020 . <br /> Water samples will be analyzed for the same <br /> constituents as above, using EPA methods 8015/602 . <br /> All samples will be analyzed on a standard two <br /> week turnaround time. <br /> Task 1 . 7 : Analyze Data and L Results <br /> Upon completion of the sample analysis and <br /> background research, a detailed evaluation of <br /> results and available information will be <br /> conducted to determine the extent and nature of <br /> subsurface contamination following the 5--step <br /> investigative process of RWQCB. This will <br /> include: <br /> Interpretation of geologic and hydrogeologic <br /> information and analysis of aquifer <br /> characteristics. <br /> Preparation of ground water level contour <br /> maps, geologic cross sections, and hydrocarbon <br /> concentration maps . <br /> - Definition of hydrocarbon contamination plume. <br /> - Assessment of the potential short- and <br /> long-term impacts of contamination on the <br /> beneficial uses of ground and surface water. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.