My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2900 - Site Mitigation Program
>
PR0505512
>
WORK PLANS_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 12:37:44 PM
Creation date
5/28/2020 12:34:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 1
RECORD_ID
PR0505512
PE
2950
FACILITY_ID
FA0006827
FACILITY_NAME
BP/MOBIL SERVICE STATION
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
02
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%Vol <br /> i <br /> Development of appropriate remediation plan, <br /> including interim measures to minimize <br /> potential environmental impact . <br /> The appropriate course of action will be developed <br /> based on evaluation of technical, economic, <br /> environmental, and legal factors . Either one or <br /> both of the following strategies will be <br /> considered: <br /> 1) Conduct further site characterization and <br /> monitoring to adequately define the nature and <br /> extent of subsurface contamination. <br /> 2) Conduct feasibility study and develop a <br /> remediation plan. <br /> Task 1 . 8 : Conduct Feasibility toand Concept-V-41 Desi n of <br /> R m is i n Plan <br /> Based on the results of the above tasks, conduct a <br /> detailed feasibility study of alternative <br /> technologies for remediation of ground water. The <br /> study will include a detailed evaluation of <br /> alternative technologies, considering technical, <br /> economic, environmental, and legal factors . <br /> Economic comparison of alternatives will consider <br /> both capital and operating costs as well as the <br /> present worth or life cycle cost of each <br /> alternative. <br /> Upon selection of the appropriate remediation <br /> alternative, a conceptual design of the selected <br /> system will be prepared including process layout, <br /> design parameters, engineering cost estimate, <br /> equipment manufacturer' s specifications, and <br /> estimated implementation schedule. <br /> Task 1 . 9 : PreparQ Sap2QrL <br /> A report presenting the findings, conclusions, and <br /> recommendations will be prepared and submitted to <br /> the appropriate regulatory agencies . The report <br /> will present the conceptual details of the <br /> selected remedial plan, including estimated cost <br /> and implementation schedule. The format of the <br /> report will follow the 5-step investigative <br /> process and the suggested outline of RWQCB. <br /> PART 2 - GROUND WATE M N T RIN AND SAMPLING <br /> As required by the RWQCB, a ground water monitoring and <br /> sampling program will need to be implemented as part of the <br /> investigation and remediation of subsurface contamination. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.