My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
U
>
UNION
>
425
>
3500 - Local Oversight Program
>
PR0545776
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 4:45:30 PM
Creation date
5/28/2020 4:35:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE HISTORY
RECORD_ID
PR0545776
PE
3528
FACILITY_ID
FA0002231
FACILITY_NAME
JACK FROST ICE SERVICE
STREET_NUMBER
425
Direction
N
STREET_NAME
UNION
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15112003
CURRENT_STATUS
02
SITE_LOCATION
425 N UNION ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y <br /> WHF ENVIRONMENTAL CONSULTANTS, INC. <br /> HEALTH AND SAFETY PLAN <br /> 1 .0 HEALTH AND SAFETY PLAN <br /> WHF Environmental Consultants , Inc . has adopted the <br /> following health and safety procedures for working <br /> with organic vapors and liquid contaminants <br /> encountered during drilling and excavation of <br /> subsurface soil. The purpose of this program is to <br /> provide health and safety precautions for the initial <br /> and subsequent site visits until the nature and <br /> magnitude of the contaminants have been defined. <br /> 1.1 Work Space <br /> Access to the project site shall be limited to the <br /> site perimeter. In no case shall the site perimeter <br /> be less than 40 feet from the borehole/excavation <br /> location for all non-authorized personnel . <br /> 1.2 Site Manager <br /> the site manager shall coordinate all activities of <br /> equipment and personnel at the project site . Site <br /> manager responsibilities will include, but are not <br /> limited to the following: <br /> - Limiting access within the site perimeter to <br /> authorized personnel . <br /> - providing written log of on-site activities and <br /> events . <br /> - containment of all contaminated soils and water <br /> prior to disposal at appropriate waste disposal <br /> site. <br /> - Notification of regulatory agencies during <br /> emergency procedures as defined in step 3 <br /> below. <br /> - Enforcement of site safety precautions . <br />
The URL can be used to link to this page
Your browser does not support the video tag.