Laserfiche WebLink
r <br /> closer to the west into Union Street, at a site approximately fifty feet from the location of <br /> r Tank #3. <br /> Soil samples will be collected at intervals of five feet during monitoring well installation. <br /> A PID unit will be on site during the drilling of these wells and samples will be selected for <br /> analysis on the basis of the PID readings. Nevertheless, a minimum of three soil samples <br /> will be sent for analysis from each boring. <br /> 11 <br /> The proposed work will commence as soon as possible after the appropriate permits are <br /> obtained. We expect that the work will begin before the end of March, 1993. However, <br /> we also anticipate that there may be problems ink obtaining an encroachment permit to <br /> install the monitoring well in Union Street and cannot estimate how long the permitting <br /> process will take- We-will keep-rHSi m info med Of dny delays or problems that we <br /> encounter in this permitting. <br /> If you have any questions or comments, please contact Steve Furnas at (209) 579-813 8 or <br /> myself at (209) 532-8021. <br /> Sincerely, <br /> Ross R. Grunwald <br /> Registered Geologist <br />