My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
U
>
UNION
>
425
>
3500 - Local Oversight Program
>
PR0545776
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 4:45:09 PM
Creation date
5/28/2020 4:38:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545776
PE
3528
FACILITY_ID
FA0002231
FACILITY_NAME
JACK FROST ICE SERVICE
STREET_NUMBER
425
Direction
N
STREET_NAME
UNION
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15112003
CURRENT_STATUS
02
SITE_LOCATION
425 N UNION ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHFEnvironrn.ental onsultants, lite. l/ <br /> Health & Set fety Plan <br /> Page: 3 <br /> !� 2.0 SAFE, Y:IMPLLM NTATION <br /> The provisions of the WTBIF Environmental Consultants, Inc. Health and Safety "Plan <br /> are ..mandatory for-.all personnel associated wit:t the sit; project-and.op6rqtions. <br /> Acorn lete background review and site visitation will be conducted in order to deter- <br /> mine whether specific amendments are to be made to the HLalth_ and Safety Plan based <br /> on specific characteristics which may exist on the job site. Any 'suspected hazards <br /> associated with the on-site operation which exposure to, vitt inhalation or skin absorp- <br /> tion, to such. as suspected carcinogens or hurnan sterilants, will be documented and i <br /> specific guidance will be developed and added to this 14calth and Safety Pian as J <br /> Appendices. <br /> A defined project site layout is paramount to the safe completion of all remedial site; ill- <br /> vestigations. The project site layout has built-in safety features. Th;; site is uivided into <br /> three zones. The following list defines the .reyuirM personnel prote �Wctive iprne� t. J <br /> 2.1 Personnel Protective Etluipmeni (PPEQ <br /> Personnel who will be working in or arotind the exclusion zone of the Jolt) -site <br /> will ,use the following protective equipment ajtd mems. es as .warrant-by the <br /> Project Manager: <br /> N <br /> - Coveralls as an undergarment <br /> Saranex outer garment. <br /> Sample gloves (inner.) U <br /> L - <br /> PVC, Nitrile or Neoprene outer gloves <br /> Hard hat a <br /> - Steel toe hoots <br /> - Robars or Tingley boots <br /> Full face-piece respirator with R53HE ca_•-tridges (a combination of <br /> organic vapor, acid gins, pesticide, radionuclide, High effilciency filter). � <br /> Note that cartridges should be chang =d daily. a <br /> All joints to be taped <br /> - Self-contained air.will be utilized ifproject dictates <br />
The URL can be used to link to this page
Your browser does not support the video tag.