Laserfiche WebLink
��DII <br /> j'1'HFEntirormentaln.vultan% Jriie. <br /> Health & ,Safety Plan <br /> Page: 4 <br /> More stringent .protective equipmentt. requirements will: be implemented if <br /> necessary. This determination will be made by the project supervisor after <br /> review of the materials to be handled, the ambient monitoring-data, consultation <br /> with on-site technical personnel, the Safety (firer, and.the'proper management <br /> personnel. LTpgrades i,3-PPE, if n=ss,-LnT, , ll. be, i—AlplenAented. . <br /> 2.2 General Safety <br /> The on-site Safety ..Officer will be responsible for the following daily safety <br /> implementations: <br /> 2.3 Daily Safety Meetings <br /> Each dav, Prior to commercini 4ork, a safety meeting shaT be held to.- disr;USs <br /> safety..considerations for the day's .work to be done. A safety topic shall. be <br /> addressed each. day .from the following list: <br /> .Site .Safety Plan (first day and once a ;week thereafter) <br /> 7 - Fire Fighting Techniques <br /> Defen sive Driving <br /> Decontami.nati in. <br />�'- Levels of I�rotectior <br /> - Heat Stress <br /> Emergency Equipment on Site <br /> Confined Space Entry Procedure - Respirator,Maintenance <br /> Self-contained Breathing Apparatus Training (if necessary) <br /> m 2.4 Safety Log <br /> A safety log shall be kept for the project work site. <br /> .2..J Eoting, Drinking Smoking <br /> AN <br /> Eating, drinking, and smoking shall be allowed only in the designated areas in <br /> the support zone. No personnel may eat, drink, or smoke oii site in any. other <br /> area. except as Permitted-by the SS0.. <br />