Laserfiche WebLink
January 24, 2020 <br /> Page 2 of 2 <br /> • Inlet piping and tank will be triple cleaned and verified by marine chemist. <br /> • Tank inlet piping will be bulk headed with construction grout <br /> • Tank will be filled full of 2 sack Plowable lean concrete . <br /> • Pump Stan pipe will be removed . <br /> • All sensors will be removed . <br /> • Pump and outlet piping will be cleaned and recycled . <br /> Organization <br /> V Aaron Swol — Project Manager <br /> 1 Marlowe Jones — Safety Coordinator <br /> ACCEPTED ON BEHALF OF Environmental Department <br /> BY: <br /> Signature <br /> Name ( printed ) <br /> Date <br /> I <br /> i <br /> Confidential <br />